Read theMandate

Require the Federal Energy Regulatory Commission to extend the time period during which licensees are…Section 1 › Proposal

The extension runs in no more than three consecutive two-year periods

To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects, section 1, Sec. 1. Written by .

The extension runs in no more than three consecutive two-year periods

The document says “shallWho acts: Federal Energy Regulatory CommissionHow: statuteSec. 1 in the PDF
What the document says

“consist of not more than 3 consecutive 2-year periods”

To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects, Sec. 1

Paragraph (1) of subsection (c). It sets the form the extension takes: up to three consecutive periods of two years each, rather than a single grant of the full term.

What the document actually says

“consist of not more than 3 consecutive 2-year periods”

To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects, Sec. 1
That sentence, in plain words

The extra time comes in two-year pieces. FERC can give up to three of them.

What this is about

Each piece lasts two years. Three pieces add up to six years.

No action is recorded against this proposal. That is not evidence that none has been taken, and nobody has yet read it against the record. See what the tracker does not yet cover.

Share this page

How to Read This Page

The quotation is the document's own words, exactly as printed, and we check the page number against the Act itself before publishing. The paragraph underneath is our summary, not the document's words. So is the plain English version, which is why it sits beside the quotation rather than replacing it.

All proposals in this section →