Documents › Agency rules › 2025-12383
Energy Department
Revision of National Environmental Policy Act Implementing Procedures
Published July 3, 2025. Takes effect July 3, 2025, printed at 90 FR 29676, amending 10 CFR 1021, 10 CFR 205. 46,590 words.
A law makes agencies weigh what a project does to nature. This rewrites the steps.
What the Rule Says It Does
This interim final rule substantially revises Department of Energy's (DOE) regulations containing its National Environmental Policy Act (NEPA) implementing procedures, which were promulgated to supplement now-rescinded Council on Environmental Quality regulations. Mindful that the Supreme Court recently clarified NEPA is a "purely procedural statute," DOE will henceforth maintain the remainder of its procedures in a procedural guidance document separate from the Code of Federal Regulations (DOE NEPA implementing procedures). Thus, DOE is revising 10 CFR part 1021 to contain only administrative and routine actions excepted from NEPA review in appendix A, its existing categorical exclusions in appendix B, related requirements, and a provision for emergency circumstances. DOE is revising appendix A in 10 CFR part 1021 to align with DOE's new NEPA implementing procedures that it is publishing separate from the Code of Federal Regulations. Appendix A in 10 CFR part 1021 (formerly categorical exclusions) are now administrative and routine actions that do not require NEPA review. DOE is also revising 10 CFR part 205, subpart W, to remove the NEPA procedures from its Presidential permit regulations.
This is the rule's own summary, as the Federal Register prints it.
The Orders It Names
- Executive Order 14154: Unleashing American Energy
- Executive Order 14301: Reforming Nuclear Reactor Testing at the Department of Energy
The rule names these orders itself. What it does about them is a reading, and none is recorded here.
On the Face of the Rule
- As filed
[Federal Register Volume 90, Number 126 (Thursday, July 3, 2025)] [Rules and Regulations] [Pages 29676-29715] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2025-12383]
Vol. 90
Thursday,
No. 126
July 3, 2025
Part III
Department of Energy
10 CFR Parts 205 and 1021
Revision of National Environmental Policy Act Implementing Procedures; Final Rule
DEPARTMENT OF ENERGY
10 CFR Parts 205 and 1021
[DOE-HQ-2025-0026] RIN 1990-AA52
Revision of National Environmental Policy Act Implementing Procedures
- AGENCY
Office of the General Counsel, Department of Energy.
- ACTION
Interim final rule; request for comments.
- DATES
This interim rule is effective July 3, 2025. Comments are due by August 4, 2025.
- ADDRESSES
Documents relevant to this rulemaking are posted on the Federal eRulemaking Portal at https://www.regulations.gov (Docket: DOE- HQ-2025-0026). Documents posted to this docket include: this interim final rule; and two “redline/strikeout” (markup) files indicating the changes in this interim final rule for 10 CFR parts 205 and 1021.
Submit comments, labeled “Revision of DOE NEPA Implementing Regulations, RIN 1990-AA52,” using the Federal eRulemaking Portal: www.regulations.gov.
Instructions: All submissions must include the agency name, “Department of Energy,” and docket number, DOE-HQ-2025-0026, for this rulemaking. All comments received will be posted without change to www.regulations.gov, including any personal information provided. Do not submit any information you consider to be private, Confidential Business Information (CBI), or other information whose disclosure is restricted by statute.
Docket: For access to the docket to read comments received, go to www.regulations.gov.
DOE NEPA procedures: DOE's new NEPA implementing procedures are available at https://energy.gov/nepa.
- FOR FURTHER INFORMATION CONTACT
Carrie Abravanel, Office of NEPA Policy and Compliance, at [email protected] or (202) 586- 4600 or Office of NEPA Policy and Compliance, U.S. Department of Energy, 1000 Independence Avenue SW, Washington, DC 20585.
The fields the Federal Register prints at the head of the rule, quoted as printed. Its summary is quoted above.
Why the Agency Says It Is Doing This
SUPPLEMENTARY INFORMATION
Table of Contents
I. Introduction
A. National Environmental Policy Act
B. DOE NEPA Implementing Procedures and Regulations
C. Changes Made in This Interim Final Rule II. Basis for Revising DOE's NEPA Implementing Regulations III. Basis for Issuing an Interim Final Rule
A. Notice-and-Comment Rulemaking Is Not Required
B. DOE Has Good Cause for Proceeding With an Interim Final Rule
C. DOE Solicits Comments IV. Procedural Requirements
A. Executive Orders 12866 and 13563
B. Regulatory Flexibility Act
C. National Environmental Policy Act
D. Executive Order 13132
E. Executive Order 13175
F. Executive Order 13211
G. Unfunded Mandates Act of 1995
H. Paperwork Reduction Act
I. Executive Orders 14154 and 14192
J. Congressional Notification VI. Approval of the Office of the Secretary
The passage that opens the rule's preamble, where the agency sets out what it is doing and on what authority. Every heading that follows it is listed below.
What the Rule Contains
Every heading the Federal Register prints in this rule, in the order it prints them. 288 headings, 46,590 words in all.
- AGENCYOn its face · 9 words
- ACTIONOn its face · 7 words
- SUMMARYOn its face · 178 words
- DATESOn its face · 16 words
- ADDRESSESOn its face · 146 words
- FOR FURTHER INFORMATION CONTACTOn its face · 37 words
- SUPPLEMENTARY INFORMATIONPreamble · 2 words
- Table of ContentsPreamble · 3 words
- I. IntroductionPreamble · 117 words
- I. IntroductionPreamble · 1,636 words
- A. National Environmental Policy ActPreamble · 502 words
- B. DOE NEPA Implementing Procedures and RegulationsPreamble · 344 words
- C. Changes Made in This Interim Final RulePreamble · 341 words
- II. Basis for Revising DOE's NEPA Implementing RegulationsPreamble · 1,341 words
- III. Basis for Issuing an Interim Final RulePreamble · 8 words
- A. Notice-and-Comment Rulemaking Is Not RequiredPreamble · 609 words
- B. DOE Has Good Cause for Proceeding With an Interim Final RulePreamble · 479 words
- C. DOE Solicits CommentPreamble · 97 words
- IV. Procedural RequirementsPreamble · 3 words
- A. Executive Orders 12866 and 13563Preamble · 311 words
- B. Regulatory Flexibility ActPreamble · 71 words
- C. National Environmental Policy ActPreamble · 132 words
- D. Executive Order 13132Preamble · 123 words
- E. Executive Order 13175Preamble · 69 words
- F. Executive Order 13211Preamble · 198 words
- G. Unfunded Mandates Act of 1995Preamble · 275 words
- H. Paperwork Reduction ActPreamble · 35 words
- I. Executive Orders 14154 and 14192Preamble · 62 words
- J. Congressional NotificationPreamble · 64 words
- VI. Approval of the Office of the SecretaryPreamble · 23 words
- List of SubjectsRegulatory text · 58 words
- Signing AuthorityRegulatory text · 1,255 words
- Table of ContentsRegulatory text · 90 words
- A1 Routine DOE Business ActionsRegulatory text · 23 words
- A2 Clarifying or Administrative Contract ActionsRegulatory text · 18 words
- A3 Certain Actions by Office of Hearings and AppealsRegulatory text · 28 words
- A4 Interpretations and Rulings for Existing RegulationsRegulatory text · 24 words
- A5 Interpretive Rulemakings With No Change in Environmental EffectRegulatory text · 32 words
- A6 Procedural RulemakingsRegulatory text · 65 words
- A8 Awards of Certain ContractsRegulatory text · 22 words
- A9 Information Gathering, Analysis, and DisseminationRegulatory text · 82 words
- A10 Reports and Recommendations on Non-DOE LegislationRegulatory text · 20 words
- A11 Technical Advice and Assistance to OrganizationsRegulatory text · 19 words
- A12 Emergency Preparedness PlanningRegulatory text · 19 words
- A13 Procedural DocumentsRegulatory text · 13 words
- A14 Approval of Technical Exchange ArrangementsRegulatory text · 39 words
- A15 International Agreements for Energy Research and DevelopmentRegulatory text · 47 words
- Table of ContentsRegulatory text · 3 words
- B. Conditions That Are Integral Elements of the Categories of Actions in Appendix BRegulatory text · 14 words
- B1. Categorical Exclusions Applicable to Facility OperationRegulatory text · 216 words
- B2. Categorical Exclusions Applicable to Safety and HealthRegulatory text · 156 words
- B4. Categorical Exclusions Applicable to Electric Power and TransmissionRegulatory text · 354 words
- B7. Categorical Exclusions Applicable to International ActivitiesRegulatory text · 25 words
- B. Conditions That Are Integral Elements of the Categories of Actions in Appendix BRegulatory text · 542 words
- B1. Categorical Exclusions Applicable to Facility OperationRegulatory text · 7 words
- B1.1 Changing Rates and PricesRegulatory text · 65 words
- B1.2 Training Exercises and SimulationsRegulatory text · 47 words
- B1.3 Routine MaintenanceRegulatory text · 500 words
- B1.4 Air Conditioning Systems for Existing EquipmentRegulatory text · 23 words
- B1.5 Existing Steam Plants and Cooling Water SystemsRegulatory text · 86 words
- B1.6 Tanks and Equipment To Control Runoff and SpillsRegulatory text · 59 words
- B1.7 Electronic EquipmentRegulatory text · 30 words
- B1.8 Screened Water Intake and Outflow StructuresRegulatory text · 33 words
- B1.9 Airway Safety Markings and PaintingRegulatory text · 42 words
- B1.10 Onsite Storage of Activated MaterialRegulatory text · 38 words
- B1.11 FencingRegulatory text · 30 words
- B1.12 Detonation or Burning of Explosives or Propellants After TestingRegulatory text · 75 words
- B1.13 Pathways, Short Access Roads, and Rail LinesRegulatory text · 49 words
- B1.14 Refueling of Nuclear ReactorsRegulatory text · 19 words
- B1.15 Support BuildingsRegulatory text · 148 words
- B1.16 Asbestos RemovalRegulatory text · 65 words
- B1.17 Polychlorinated Biphenyl RemovalRegulatory text · 48 words
- B1.18 Water Supply WellsRegulatory text · 86 words
- B1.19 Microwave, Meteorological, And Radio TowersRegulatory text · 51 words
- B1.20 Protection of Cultural Resources, Fish and Wildlife HabitatRegulatory text · 62 words
- B1.21 Noise AbatementRegulatory text · 21 words
- B1.22 Relocation of BuildingsRegulatory text · 31 words
- B1.23 Demolition and Disposal of BuildingsRegulatory text · 56 words
- B1.24 Property TransfersRegulatory text · 159 words
- B1.26 Small Water Treatment FacilitiesRegulatory text · 44 words
- B1.27 Disconnection of UtilitiesRegulatory text · 42 words
- B1.28 Placing a Facility in an Environmentally Safe ConditionRegulatory text · 94 words
- B1.29 Disposal Facilities for Construction and Demolition WasteRegulatory text · 87 words
- B1.30 Transfer ActionsRegulatory text · 73 words
- B1.31 Installation or Relocation of Machinery and EquipmentRegulatory text · 110 words
- B1.32 Traffic Flow AdjustmentsRegulatory text · 57 words
- B1.33 Stormwater Runoff ControlRegulatory text · 69 words
- B1.34 Lead-Based Paint Containment, Removal, and DisposalRegulatory text · 44 words
- B1.35 Drop-Off, Collection, and Transfer Facilities for Recyclable MaterialsRegulatory text · 107 words
- B1.36 Determinations of Excess Real PropertyRegulatory text · 79 words
- B2. Categorical Exclusions Applicable to Safety and HealthRegulatory text · 8 words
- B2.1 Workplace EnhancementsRegulatory text · 44 words
- B2.2 Building and Equipment InstrumentationRegulatory text · 63 words
- B2.3 Personnel Safety and Health EquipmentRegulatory text · 53 words
- B2.4 Equipment QualificationRegulatory text · 70 words
- B2.5 Facility Safety and Environmental ImprovementsRegulatory text · 176 words
- B2.6 Recovery of Radioactive Sealed SourcesRegulatory text · 62 words
- B3.1 Site Characterization and Environmental MonitoringRegulatory text · 310 words
- B3.2 Aviation ActivitiesRegulatory text · 18 words
- B3.3 Research Related to Conservation of Fish, Wildlife, and Cultural ResourcesRegulatory text · 63 words
- B3.4 Transport Packaging Tests for Radioactive or Hazardous MaterialRegulatory text · 43 words
- B3.5 Tank Car TestsRegulatory text · 142 words
- B3.7 New Terrestrial Infill Exploratory and Experimental WellsRegulatory text · 134 words
- B3.8 Outdoor Terrestrial Ecological and Environmental ResearchRegulatory text · 73 words
- B3.9 Projects To Reduce Emissions and Waste GenerationRegulatory text · 230 words
- B3.10 Particle AcceleratorsRegulatory text · 128 words
- B3.11 Outdoor Tests and Experiments on Materials and Equipment ComponentsRegulatory text · 130 words
- B3.12 Microbiological and Biomedical FacilitiesRegulatory text · 117 words
- B3.13 Magnetic Fusion ExperimentsRegulatory text · 25 words
- B3.14 Small-Scale Educational FacilitiesRegulatory text · 162 words
- B3.16 Research Activities in Aquatic EnvironmentsRegulatory text · 326 words
- B4. Categorical Exclusions Applicable to Electrical Power and TransmissionRegulatory text · 9 words
- B4.1 Contracts, Policies, and Marketing and Allocation Plans for Electric PowerRegulatory text · 47 words
- B4.2 Export of Electric EnergyRegulatory text · 33 words
- B4.3 Electric Power Marketing Rate ChangesRegulatory text · 45 words
- B4.4 Power Marketing Services and ActivitiesRegulatory text · 51 words
- B4.5 Temporary Adjustments to River OperationsRegulatory text · 46 words
- B4.6 Additions and Modifications to Transmission FacilitiesRegulatory text · 78 words
- B4.7 Fiber Optic CableRegulatory text · 44 words
- B4.8 Electricity Transmission AgreementsRegulatory text · 58 words
- B4.9 Multiple Use of Powerline Rights-of-WayRegulatory text · 42 words
- B4.10 Removal of Electric Transmission FacilitiesRegulatory text · 39 words
- B4.11 Electric Power Substations and Interconnection FacilitiesRegulatory text · 27 words
- B4.12 Construction of PowerlinesRegulatory text · 33 words
- B4.13 Upgrading and Rebuilding Existing PowerlinesRegulatory text · 279 words
- B5.1 Actions To Conserve Energy or WaterRegulatory text · 353 words
- B5.2 Modifications to Pumps and PipingRegulatory text · 70 words
- B5.3 Modification or Abandonment of WellsRegulatory text · 90 words
- B5.4 Repair or Replacement of PipelinesRegulatory text · 72 words
- B5.5 Short Pipeline SegmentsRegulatory text · 72 words
- B5.6 Oil Spill CleanupRegulatory text · 37 words
- B5.7 Export of Natural Gas and Associated Transportation by Marine VesselRegulatory text · 46 words
- B5.9 Temporary Exemptions for Electric PowerplantsRegulatory text · 27 words
- B5.10 Certain Permanent Exemptions for Existing Electric PowerplantsRegulatory text · 49 words
- B5.11 Permanent Exemptions Allowing Mixed Natural Gas and PetroleumRegulatory text · 50 words
- B5.12 Workover of Existing WellsRegulatory text · 118 words
- B5.13 Experimental Wells for Injection of Small Quantities of Carbon DioxideRegulatory text · 198 words
- B5.14 Combined Heat and Power or Cogeneration SystemsRegulatory text · 84 words
- B5.15 Small-Scale Renewable Energy Research and Development and Pilot ProjectsRegulatory text · 66 words
- B5.16 Solar Photovoltaic SystemsRegulatory text · 115 words
- B5.17 Solar Thermal SystemsRegulatory text · 83 words
- B5.18 Wind TurbinesRegulatory text · 187 words
- B5.19 Ground Source Heat PumpsRegulatory text · 130 words
- B5.20 Biomass Power PlantsRegulatory text · 138 words
- B5.21 Methane Gas Recovery and Utilization SystemsRegulatory text · 92 words
- B5.22 Alternative Fuel Vehicle Fueling StationsRegulatory text · 95 words
- B5.23 Electric Vehicle Charging StationsRegulatory text · 66 words
- B5.24 Drop-In Hydroelectric SystemsRegulatory text · 461 words
- B6.1 Cleanup ActionsRegulatory text · 591 words
- B6.2 Waste Collection, Treatment, Stabilization, and Containment FacilitiesRegulatory text · 122 words
- B6.3 Improvements to Environmental Control SystemsRegulatory text · 237 words
- B6.6 Modification of Facilities for Storing, Packaging, and Repacking WasteRegulatory text · 50 words
- B6.8 Modifications for Waste Minimization and Reuse of MaterialsRegulatory text · 70 words
- B6.9 Measures To Reduce Migration of Contaminated GroundwaterRegulatory text · 58 words
- B6.10 Upgraded or Replacement Waste Storage FacilitiesRegulatory text · 103 words
- B7. Categorical Exclusions Applicable to International ActivitiesRegulatory text · 7 words
- B7.1 Emergency Measures Under the International Energy ProgramRegulatory text · 20 words
- B7.2 Import and Export of Special Nuclear or Isotopic MaterialsRegulatory text · 69 words
- AppendixRegulatory text · 1 words
- U.S. Department of EnergyRegulatory text · 14 words
- Table of ContentsRegulatory text · 13,353 words
- Appendix A: Administrative and Routine Actions Excepted From NEPA ReviewRegulatory text · 62 words
- Table of ContentsRegulatory text · 90 words
- A1 Routine DOE Business ActionsRegulatory text · 23 words
- A2 Clarifying or Administrative Contract ActionsRegulatory text · 18 words
- A3 Certain Actions by Office of Hearings and AppealsRegulatory text · 28 words
- A4 Interpretations and Rulings for Existing RegulationsRegulatory text · 24 words
- A5 Interpretive Rulemakings With No Change in Environmental EffectRegulatory text · 32 words
- A6 Procedural RulemakingsRegulatory text · 65 words
- A8 Awards of Certain ContractsRegulatory text · 22 words
- A9 Information Gathering, Analysis, and DisseminationRegulatory text · 82 words
- A10 Reports and Recommendations on Non-DOE LegislationRegulatory text · 20 words
- A11 Technical Advice and Assistance to OrganizationsRegulatory text · 19 words
- A12 Emergency Preparedness PlanningRegulatory text · 19 words
- A13 Procedural DocumentsRegulatory text · 13 words
- A14 Approval of Technical Exchange ArrangementsRegulatory text · 39 words
- A15 International Agreements for Energy Research and DevelopmentRegulatory text · 36 words
- Appendix B:Categorical Exclusions Applicable to Specific Agency ActionsRegulatory text · 17 words
- Table of ContentsRegulatory text · 3 words
- B. Conditions That Are Integral Elements of the Classes of Actions in Appendix BRegulatory text · 14 words
- B1. Categorical Exclusions Applicable to Facility OperationRegulatory text · 216 words
- B2. Categorical Exclusions Applicable to Safety and HealthRegulatory text · 156 words
- B4. Categorical Exclusions Applicable to Electric Power and TransmissionRegulatory text · 354 words
- B7. Categorical Exclusions Applicable to International ActivitiesRegulatory text · 25 words
- B. Conditions That Are Integral Elements of the Classes of Actions in Appendix BRegulatory text · 542 words
- B1. Categorical Exclusions Applicable to Facility OperationRegulatory text · 7 words
- B1.1 Changing Rates and PricesRegulatory text · 65 words
- B1.2 Training Exercises and SimulationsRegulatory text · 47 words
- B1.3 Routine MaintenanceRegulatory text · 500 words
- B1.4 Air Conditioning Systems for Existing EquipmentRegulatory text · 23 words
- B1.5 Existing Steam Plants and Cooling Water SystemsRegulatory text · 86 words
- B1.6 Tanks and Equipment To Control Runoff and SpillsRegulatory text · 59 words
- B1.7 Electronic EquipmentRegulatory text · 30 words
- B1.8 Screened Water Intake and Outflow StructuresRegulatory text · 33 words
- B1.9 Airway Safety Markings and PaintingRegulatory text · 42 words
- B1.10 Onsite Storage of Activated MaterialRegulatory text · 38 words
- B1.11 FencingRegulatory text · 30 words
- B1.12 Detonation or Burning of Explosives or Propellants After TestingRegulatory text · 75 words
- B1.13 Pathways, Short Access Roads, and Rail LinesRegulatory text · 49 words
- B1.14 Refueling of Nuclear ReactorsRegulatory text · 19 words
- B1.15 Support BuildingsRegulatory text · 148 words
- B1.16 Asbestos RemovalRegulatory text · 65 words
- B1.17 Polychlorinated Biphenyl RemovalRegulatory text · 48 words
- B1.18 Water Supply WellsRegulatory text · 86 words
- B1.19 Microwave, Meteorological, and Radio TowersRegulatory text · 51 words
- B1.20 Protection of Cultural Resources, Fish and Wildlife HabitatRegulatory text · 62 words
- B1.21 Noise AbatementRegulatory text · 21 words
- B1.22 Relocation of BuildingsRegulatory text · 31 words
- B1.23 Demolition and Disposal of BuildingsRegulatory text · 56 words
- B1.24 Property TransfersRegulatory text · 159 words
- B1.26 Small Water Treatment FacilitiesRegulatory text · 44 words
- B1.27 Disconnection of UtilitiesRegulatory text · 42 words
- B1.28 Placing a Facility in an Environmentally Safe ConditionRegulatory text · 94 words
- B1.29 Disposal Facilities for Construction and Demolition WasteRegulatory text · 87 words
- B1.30 Transfer ActionsRegulatory text · 73 words
- B1.31 Installation or Relocation of Machinery and EquipmentRegulatory text · 110 words
- B1.32 Traffic Flow AdjustmentsRegulatory text · 57 words
- B1.33 Stormwater Runoff ControlRegulatory text · 69 words
- B1.34 Lead-Based Paint Containment, Removal, and DisposalRegulatory text · 44 words
- B1.35 Drop-Off, Collection, and Transfer Facilities for Recyclable MaterialsRegulatory text · 107 words
- B1.36 Determinations of Excess Real PropertyRegulatory text · 79 words
- B2. Categorical Exclusions Applicable to Safety and HealthRegulatory text · 8 words
- B2.1 Workplace EnhancementsRegulatory text · 44 words
- B2.2 Building and Equipment InstrumentationRegulatory text · 63 words
- B2.3 Personnel Safety and Health EquipmentRegulatory text · 53 words
- B2.4 Equipment QualificationRegulatory text · 70 words
- B2.5 Facility Safety and Environmental ImprovementsRegulatory text · 176 words
- B2.6 Recovery of Radioactive Sealed SourcesRegulatory text · 62 words
- B3.1 Site Characterization and Environmental MonitoringRegulatory text · 310 words
- B3.2 Aviation ActivitiesRegulatory text · 18 words
- B3.3 Research Related to Conservation of Fish, Wildlife, and Cultural ResourcesRegulatory text · 63 words
- B3.4 Transport Packaging Tests for Radioactive or Hazardous MaterialRegulatory text · 43 words
- B3.5 Tank Car TestsRegulatory text · 143 words
- B3.7 New Terrestrial Infill Exploratory and Experimental WellsRegulatory text · 134 words
- B3.8 Outdoor Terrestrial Ecological and Environmental ResearchRegulatory text · 73 words
- B3.9 Projects To Reduce Emissions and Waste GenerationRegulatory text · 230 words
- B3.10 Particle AcceleratorsRegulatory text · 128 words
- B3.11 Outdoor Tests and Experiments on Materials and Equipment ComponentsRegulatory text · 130 words
- B3.12 Microbiological and Biomedical FacilitiesRegulatory text · 117 words
- B3.13 Magnetic Fusion ExperimentsRegulatory text · 25 words
- B3.14 Small-Scale Educational FacilitiesRegulatory text · 488 words
- B4. Categorical Exclusions Applicable to Electrical Power and TransmissionRegulatory text · 9 words
- B4.1 Contracts, Policies, and Marketing and Allocation Plans for Electric PowerRegulatory text · 47 words
- B4.2 Export of Electric EnergyRegulatory text · 33 words
- B4.3 Electric Power Marketing Rate ChangesRegulatory text · 45 words
- B4.4 Power Marketing Services and ActivitiesRegulatory text · 51 words
- B4.5 Temporary Adjustments to River OperationsRegulatory text · 46 words
- B4.6 Additions and Modifications to Transmission FacilitiesRegulatory text · 78 words
- B4.7 Fiber Optic CableRegulatory text · 44 words
- B4.8 Electricity Transmission AgreementsRegulatory text · 58 words
- B4.9 Multiple Use of Powerline Rights-of-WayRegulatory text · 42 words
- B4.10 Removal of Electric Transmission FacilitiesRegulatory text · 39 words
- B4.11 Electric Power Substations and Interconnection FacilitiesRegulatory text · 27 words
- B4.12 Construction of PowerlinesRegulatory text · 33 words
- B4.13 Upgrading and Rebuilding Existing PowerlinesRegulatory text · 269 words
- B5.1 Actions To Conserve Energy or WaterRegulatory text · 353 words
- B5.2 Modifications to Pumps and PipingRegulatory text · 70 words
- B5.3 Modification or Abandonment of WellsRegulatory text · 90 words
- B5.4 Repair or Replacement of PipelinesRegulatory text · 72 words
- B5.5 Short Pipeline SegmentsRegulatory text · 72 words
- B5.6 Oil Spill CleanupRegulatory text · 37 words
- B5.7 Export of Natural Gas and Associated Transportation by Marine VesselRegulatory text · 46 words
- B5.9 Temporary Exemptions for Electric PowerplantsRegulatory text · 27 words
- B5.10 Certain Permanent Exemptions for Existing Electric PowerplantsRegulatory text · 49 words
- B5.11 Permanent Exemptions Allowing Mixed Natural Gas and PetroleumRegulatory text · 50 words
- B5.12 Workover of Existing WellsRegulatory text · 118 words
- B5.13 Experimental Wells for Injection of Small Quantities of Carbon DioxideRegulatory text · 198 words
- B5.14 Combined Heat and Power or Cogeneration SystemsRegulatory text · 84 words
- B5.15 Small-Scale Renewable Energy Research and Development and Pilot ProjectsRegulatory text · 66 words
- B5.16 Solar Photovoltaic SystemsRegulatory text · 112 words
- B5.17 Solar Thermal SystemsRegulatory text · 83 words
- B5.18 Wind TurbinesRegulatory text · 187 words
- B5.19 Ground Source Heat PumpsRegulatory text · 129 words
- B5.20 Biomass Power PlantsRegulatory text · 138 words
- B5.21 Methane Gas Recovery and Utilization SystemsRegulatory text · 92 words
- B5.22 Alternative Fuel Vehicle Fueling StationsRegulatory text · 95 words
- B5.23 Electric Vehicle Charging StationsRegulatory text · 66 words
- B5.24 Drop-In Hydroelectric SystemsRegulatory text · 461 words
- B6.1 Cleanup ActionsRegulatory text · 591 words
- B6.2 Waste Collection, Treatment, Stabilization, and Containment FacilitiesRegulatory text · 122 words
- B6.3 Improvements to Environmental Control SystemsRegulatory text · 237 words
- B6.6 Modification of Facilities for Storing, Packaging, and Repacking WasteRegulatory text · 50 words
- B6.8 Modifications for Waste Minimization and Reuse of MaterialsRegulatory text · 70 words
- B6.9 Measures To Reduce Migration of Contaminated GroundwaterRegulatory text · 58 words
- B6.10 Upgraded or Replacement Waste Storage FacilitiesRegulatory text · 103 words
- B7. Categorical Exclusions Applicable to International ActivitiesRegulatory text · 7 words
- B7.1 Emergency Measures Under the International Energy ProgramRegulatory text · 20 words
- B7.2 Import and Export of Special Nuclear or Isotopic MaterialsRegulatory text · 1,164 words
The Rest of the Text
This rule runs to 46,590 words. The rest of it is set out over 3 pages, split at the rule's own headings so that no heading is parted from the words printed under it.
- Text 1 of 3: I. Introduction to U.S. Department of Energy151 headings · 19,772 words
- Text 2 of 3: Table of Contents to B3.13 Magnetic Fusion Experiments80 headings · 19,798 words
- Text 3 of 3: B3.14 Small-Scale Educational Facilities to B7.2 Import and Export of Special Nuclear or Isotopic Materials48 headings · 6,426 words
- The rule itself
Energy Department, “Revision of National Environmental Policy Act Implementing Procedures,” 90 FR 29676 (July 3, 2025). Effective July 3, 2025.
https://www.federalregister.gov/documents/2025/07/03/2025-12383/revision-of-national-environmental-policy-act-implementing-procedures - This page
“Revision of National Environmental Policy Act Implementing Procedures,” a final rule naming an order indexed here. Read the Mandate, https://readthemandate.org/rules/rule-2025-12383/ (retrieved October 10, 2026).
Cite the document when the claim is about what the document says. Cite this page when the indexing, the wording or the record of what has happened is what is being relied on.
How This Rule Is Set Out
Federal Register documents are United States government works and are not under copyright, so the rule is here whole rather than cut to an excerpt. It is split at the headings the Register itself prints: the line it is filed under, the captioned fields on its face, the preamble where the agency says what it is doing and why, and the amendments to the Code of Federal Regulations. No passage is shortened. This rule is long enough that its text is set out over 3 pages rather than one.
Two things the Register prints are not reproduced: the running head it repeats at every page break, and the tables it sets as pictures rather than as words. Its own marker for one of those tables, [GRAPHIC] [TIFF OMITTED], is left standing where the table was, so a reader can see that something is there and follow the link to the page it is on.
A heading with nothing quoted under it is one the rule prints on its own, with the words that follow it set under the headings beneath.