Nuclear Regulatory Commission
Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
The text of the rule, page 2 of 2. 1 heading, 13,601 words, quoted as the Federal Register prints them.
← B. Major Provisions to XVI. Availability of DocumentsContents
List of Subjects in 10 CFR Part 51
Administrative practice and procedure, Environmental impact statements, Hazardous waste, Nuclear energy, Nuclear materials, Nuclear power plants and reactors, Reporting and recordkeeping requirements.
For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; and 5 U.S.C. 552 and 553, the NRC amends 10 CFR part 51 as follows:
PART 51--ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS
0 1. The authority citation for part 51 continues to read as follows:
Authority: Atomic Energy Act of 1954, secs. 161, 193 (42 U.S.C. 2201, 2243); Energy Reorganization Act of 1974, secs. 201, 202 (42 U.S.C. 5841, 5842); National Environmental Policy Act of 1969 (42 U.S.C. 4332, 4334, 4335); Nuclear Waste Policy Act of 1982, secs. 144(f), 121, 135, 141, 148 (42 U.S.C. 10134(f), 10141, 10155, 10161, 10168); 44 U.S.C. 3504 note. Sections 51.20, 51.30, 51.60, 51.80. and 51.97 also issued under Nuclear Waste Policy Act secs. 135, 141, 148 (42 U.S.C. 10155, 10161, 10168). Section 51.22 also issued under Atomic Energy Act sec. 274 (42 U.S.C. 2021) and under Nuclear Waste Policy Act sec. 121 (42 U.S.C. 10141). Sections 51.43, 51.67, and 51.109 also issued under Nuclear Waste Policy Act sec. 114(f) (42 U.S.C. 10134(f)).
0 2. Amend Sec. 51.49 by: 0 a. Adding paragraph (a)(4). 0 b. Revising paragraph (b). 0 c. Adding paragraphs (c)(4), (d)(6), and (e)(3).
The additions and revisions read as follows:
Sec. 51.49 Environmental report--limited work authorization.
(a) * * *
(4) If the application for the construction permit or combined license will rely on any of the findings in appendix C to subpart A of this part in its environmental report, then the environmental report for the limited work authorization may implement the process in Sec. 51.50(d) to determine whether it can rely on any of the findings in appendix C to subpart A of this part.
(b) Phased application for limited work authorization and construction permit or combined license. If the construction permit or combined license application is filed in accordance with Sec. 2.101(a)(9) of this chapter, then the environmental report for part one of the application may be limited to a discussion of the activities proposed to be conducted under the limited work authorization. If the scope of the environmental report for part one is so limited, then:
(1) Part two of the application must include the information required by Sec. 51.50, as applicable; and
(2) If part two of the application will rely on any of the findings in appendix C to subpart A of this part in its environmental report, then the environmental report for part one may implement the process in Sec. 51.50(d) to determine whether it can rely on any of the findings in appendix C to subpart A of this part.
(c) * * *
(4) If the application for the early site permit will rely on any of the findings in appendix C to subpart A of this part in its environmental report, then the environmental report for the limited work authorization may implement the process in Sec. 51.50(d) to determine whether it can rely on any of the findings in appendix C to subpart A of this part.
(d) * * *
(6) If the environmental impact statement for the early site permit relied on any of the findings in appendix C to subpart A of this part in its environmental report, then the environmental report for the limited work authorization may implement the process in Sec. 51.50(d) to determine whether it can rely on any of the findings in appendix C to subpart A of this part for issues that were not resolved in the environmental impact statement for the early site permit.
(e) * * *
(3) If the environmental impact statement for the construction permit relied on any of the findings in appendix C to subpart A of this part in its environmental report, then the environmental report for the limited work authorization may implement the process in Sec. 51.50(d) to determine whether it can rely on any of the findings in appendix C to subpart A of this part. * * * * *
0 3. In Sec. 51.50, amend paragraph (a) by adding a new second sentence, and adding paragraph (d) to read as follows:
Sec. 51.50 Environmental report--construction permit, early site permit, or combined license stage.
(a) * * * For non-light-water reactors as defined in Sec. 50.2 of this chapter, the environmental report shall contain the basis for evaluating the contribution of the environmental effects of fuel cycle activities for the nuclear reactor. * * * * * * * *
(d) Application for a construction permit, early site permit, or combined license for a nuclear reactor. If an application is for a construction permit, an early site permit, or a combined license that does not reference an early site permit for a nuclear reactor, as defined in Sec. 50.2 of this chapter, and further, if the applicant chooses to rely upon the findings of one or more of the issues identified as Category 1 issues in appendix C to subpart A of this part, then, in addition to the information and analyses required in paragraph (a), (b), or (c) of this section, as appropriate, the applicant's environmental report will be subject to the following conditions and considerations:
(1) The environmental report must contain information to demonstrate that the values and assumptions in appendix C to subpart A of this part are met, and no new and significant information is identified in accordance with paragraph (d)(5) of this section, for each Category 1 issue for which the applicant relies on the finding for that issue.
(2) The environmental report is not required to contain analyses of the environmental impacts of any issue identified as a Category 1 issue in appendix C to subpart A of this part, provided that the environmental report contains the information specified in paragraph (d)(1) of this section.
(3) The environmental report must contain analyses of the environmental impacts of the proposed action, including the construction, operation, and decommissioning of the proposed nuclear reactor, for:
(i) Any Category 1 issue for which the values and assumptions are not met or for which new and significant information is identified in accordance with paragraph (d)(5) of this section; and
(ii) Each issue identified as a Category 2 issue in appendix C to subpart A of this part.
(4) The environmental report must contain a consideration of alternatives for reducing adverse environmental impacts, as required by Sec. 51.45(c), for all issues identified as Category 1 issues in appendix C to subpart A of this part for which the environmental report does not contain the information specified in paragraph (d)(1) of this section, and for
all issues identified as Category 2 issues in appendix C to subpart A of this part. No such consideration is required for Category 1 issues in appendix C to subpart A of this part that meet the applicable values and assumptions as specified in paragraph (d)(1) of this section.
(5) The environmental report must contain any new and significant information of which the applicant is aware regarding the environmental impacts for all issues identified as Category 1 issues in appendix C to subpart A of this part for which the applicant relies on the findings for those issues.
(6) The environmental report must contain a description of the process used to identify new and significant information regarding the issues identified as Category 1 issues in appendix C to subpart A of this part for which the applicant relies on the findings for those issues.
Sec. 51.53 [Amended]
0 4. In Sec. 51.53, amend paragraph (d) by removing the reference “Sec. 50.82 or Sec. 53.1080 of this chapter” and adding in its place the references “Sec. 50.82, Sec. 52.110, or Sec. 53.1080 of this chapter”.
0 5. In Sec. 51.75, add paragraph (d) to read as follows:
Sec. 51.75 Draft environmental impact statement--construction permit, early site permit, or combined license.
* * * * *
(d) Construction permit, early site permit, or combined license for a nuclear reactor. If a draft environmental impact statement is being prepared in accordance with paragraph (a), (b), or (c) of this section, and if applicant's environmental report relied upon the findings of one or more of the issues identified as Category 1 issues in appendix C to subpart A of this part, the draft environmental impact statement must be prepared as a supplement to NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors.” In addition, the NRC staff will conduct scoping in accordance with Sec. 51.26(a) and (b). The draft supplemental environmental impact statement will incorporate the conclusions in NUREG-2249 for issues identified as Category 1 for which the applicant has demonstrated that the applicable values and assumptions have been met and for which neither the applicant nor the NRC identified any new and significant information. The draft supplemental environmental impact statement must contain an analysis for those issues identified as Category 1 for which the applicant could not demonstrate that the applicable values and assumptions were met or for which any new and significant information was identified by the applicant or the NRC, and for those issues identified as Category 2.
0 6. In Sec. 51.76, revise paragraph (f) to read as follows:
Sec. 51.76 Draft environmental impact statement--limited work authorization.
* * * * *
(f) Draft environmental impact statement. A draft environmental impact statement prepared under this section must separately evaluate the environmental impacts and proposed alternatives attributable to the activities proposed to be conducted under the limited work authorization. However, if the “Applicant's Environmental Report-- Limited Work Authorization Stage,” also contains the information required to be submitted in the environmental report required under Sec. 51.50, then the environmental impact statement must address the impacts of construction and operation for the proposed facility (including the environmental impacts attributable to the limited work authorization), and discuss the overall costs and benefits balancing for the underlying proposed action, in accordance with Sec. 51.71, and Sec. 51.75(a) or (c), as applicable. For any draft environmental impact statement prepared under this section, if the applicant's environmental report relied upon the findings of one or more of the issues identified as Category 1 issues in appendix C to subpart A of this part, the draft environmental impact statement must be prepared as a supplement to NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors.” In addition, the NRC staff will conduct scoping in accordance with Sec. 51.26(a) and (b). The draft supplemental environmental impact statement will incorporate the conclusions in NUREG-2249 for issues identified as Category 1 for which the applicant has demonstrated that the applicable values and assumptions have been met and for which neither the applicant nor the NRC identified any new and significant information. The draft supplemental environmental impact statement must contain an analysis for those issues identified as Category 1 for which the applicant could not demonstrate that the applicable values and assumptions were met or for which any new and significant information was identified by the applicant or the NRC, and for those issues identified as Category 2.
0 7. Add Sec. 51.96 under the undesignated center heading “Final Environmental Impact Statements--Production and Utilization Facilities” to read as follows:
Sec. 51.96 Final supplemental environmental impact statement relying on a generic environmental impact statement for licensing new nuclear reactors.
(a) In connection with a construction permit, an early site permit, or a combined license that does not reference an early site permit for a nuclear reactor, as defined in 10 CFR 50.2, and for which the NRC staff relied on any of the findings in appendix C to subpart A of this part in preparing a draft supplemental environmental impact statement in accordance with Sec. 51.75(d), the NRC shall prepare a final supplemental environmental impact statement, which is a supplement to the Commission's NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors.”
(b) The final supplemental environmental impact statement required by paragraph (a) of this section must contain the NRC staff's recommendation regarding the environmental acceptability of approving the construction permit, the early site permit, or the combined license. In order to make recommendations and reach a final decision on the proposed action, the NRC staff, adjudicatory officers, and Commission shall integrate:
(1) The conclusions in NUREG-2249 for issues designated as Category 1 for which the applicant has demonstrated that the applicable values and assumptions have been met and for which neither the applicant nor the NRC staff identified any new and significant information.
(2) Information developed for those Category 1 issues for which the applicant could not demonstrate that the applicable values and assumptions were met and those Category 2 issues applicable to the plant under Sec. 51.50(d) and any new and significant information.
(c) The final supplemental environmental impact statement required by paragraph (a) of this section shall address those issues as required by Sec. 51.91 and shall be distributed in accordance with Sec. 51.93.
(d) In connection with a combined license that references an early site permit for which the NRC staff relied on any of the findings in appendix C to subpart A of this part in preparing the supplemental environmental impact statement for that early site permit, the NRC shall prepare a supplement to that final supplemental environmental impact statement. The supplement must
meet the requirements of Sec. 51.92(e) and shall be considered a supplement to NUREG-2249.
(e) In connection with a combined license that references an early site permit for which the NRC staff relied on any of the findings in appendix C to subpart A of this part in preparing the draft supplemental environmental impact statement, the NRC staff shall prepare a supplement to the early site permit environmental impact statement. The supplement must be prepared in accordance with Sec. 51.92(e) and shall be considered a supplement to NUREG-2249.
(f) In connection with the issuance of an operating license for which the NRC staff relied on any of the findings in appendix C to subpart A of this part in preparing the supplemental environmental impact statement for the construction permit for that nuclear reactor, the NRC shall prepare a supplement to the final supplemental environmental impact statement. The supplement must meet the requirements of Sec. 51.95(b) and shall be considered a supplement to NUREG-2249.
0 8. Add appendix C to subpart A of part 51 to read as follows:
Appendix C to Subpart A of Part 51--Environmental Effect of Issuing a Permit or License for a New Nuclear Reactor
The Commission has assessed the environmental impacts associated with authorizing the construction, operation, and decommissioning of a nuclear reactor. Table C-1 summarizes the Commission's generic findings on the scope and magnitude of environmental impacts of such an authorization as required by section 102(2) of the National Environmental Policy Act of 1969, as amended. Table C-1 presents the results of the generic analysis of those environmental impacts associated with building,\1\ operating, and decommissioning a nuclear reactor that the NRC has designated as Category 1, as well as listing the issues that could not be resolved generically, designated as Category 2. The use of this table by applicants will be in accordance with Sec. 51.50(d), and the use by the staff will be in accordance with Sec. Sec. 51.75(d) and 51.96. On a 10-year cycle, the Commission intends to review the material in this appendix and update it if necessary. A scoping notice must be published in the Federal Register indicating the results of the NRC's review and inviting public comments and proposals for other areas that should be updated.
\1\ The term “building,” as used in the NR GEIS, includes the full range of preconstruction (building activities not within the NRC's regulatory authority), and construction and installation activities (building activities within the NRC's regulatory authority).
Table C-1--Summary of Findings on Environmental Issues for Issuing a Permit or License for a New Nuclear Reactor
\1\
Plant parameter envelope/site
Issue Category Finding \3\ parameter envelope values and
\2\ assumptions \4\
Land Use
Construction:
Onsite Land Use................... 1 SMALL....................... The proposed project,
including any associated land
uses, complies with NRC
siting regulations in 10 CFR
part 100. The site size is
100 acres [ac] (40.5 hectares
[ha]) or less. The permanent
footprint of disturbance
includes 30 ac (12 ha) or
less of vegetated lands, and
the temporary footprint of
disturbance includes no more
than an additional 20 ac (8.1
ha) or less of vegetated
lands. The proposed project
complies with the site's
zoning and is consistent with
any relevant land use plans
or comprehensive plans. The
site would not be situated
closer than 0.5 miles [mi]
(0.8 kilometers [km]) to
existing residential areas or
1.0 mi (1.6 km) to sensitive
land uses such as Federal,
State, or local parks;
wildlife refuges;
conservation lands; Wild and
Scenic Rivers; or Natural
Heritage Rivers. The site
does not have a history of
past industrial use capable
of leaving a legacy of
contamination requiring
cleanup to protect human
health and the environment.
The total wetland loss from
use of the site, including
use of any offsite rights-of-
way (ROWs), would be no more
than 0.5 ac (0.2 ha). Best
management practices (BMPs)
for erosion, sediment
control, and stormwater
management would be used.
Compliance with any
mitigation measures
established through zoning
ordinances, local building
permits, site use permits, or
other land use
authorizations.
Offsite Land Use.................. 1 SMALL....................... New offsite ROWs for
transmission lines,
pipelines, or access roads
would be no more than 100
feet [ft] (30.5 meters [m])
in width and total no more
than 1 mi (1.6 km) in length.
No new offsite ROW would be
situated closer than 0.5 mi
(0.8 km) to existing
residential areas or
sensitive land uses such as
Federal, State, or local
parks; wildlife refuges;
conservation lands; Wild and
Scenic Rivers; or Natural
Heritage Rivers. No existing
ROWs in residential areas
would be used or widened to
accommodate project features.
No ROW has a history of past
industrial use capable of
leaving a legacy of
contamination requiring
cleanup to protect human
health and the environment.
The total wetland loss from
use of the entire project,
including use of the site and
any offsite ROWs, would be no
more than 0.5 ac (0.2 ha).
BMPs for erosion, sediment
control, and stormwater
management would be used.
Compliance with any
mitigation measures
established through zoning
ordinances, local building
permits, site use permits, or
other land use
authorizations.
Impacts to Prime and Unique 1 SMALL....................... The site size is (40.5 ha) or
Farmland. less. The site does not
contain any prime or unique
farmland or other farmland of
statewide or local
importance; or the site does
not abut any agricultural
land and is not situated in a
predominantly agricultural
landscape.
Coastal Zone and Compliance with 1 SMALL....................... The site is not situated in
the Coastal Zone Management Act any designated coastal zone,
(16 U.S.C. 1451 et seq.). or the applicant can
demonstrate that the affected
State(s) have or will issue a
consistency determination or
other indication that the
project complies with the
Coastal Zone Management Act. Operation:
Onsite Land Use................... 1 SMALL....................... The proposed project,
including any associated land
uses, complies with NRC
siting regulations in 10 CFR
part 100. The site size is
100 ac (40.5 ha) or less. If
needed, cooling towers would
be mechanical draft, not
natural draft; less than 100
ft (30.5 m) in height; and
equipped with drift
eliminators. Any makeup water
for the cooling towers would
be fresh water (less than 1
part per trillion [ppt]
salinity). BMPs for erosion,
sediment control, and
stormwater management would
be used.
Offsite Land Use.................. 1 SMALL....................... New offsite ROWs for
transmission lines,
pipelines, or access roads
would be no more than 100 ft
(30.5 m) in width and total
no more than 1 mi (1.6 km) in
length. BMPs for erosion,
sediment control, and
stormwater management would
be used (wherever land is
disturbed during the course
of ROW management).
Visual Resources
Construction:
Visual Impacts in Site and 1 SMALL....................... The site size is 100 ac (40.5
Vicinity. ha) or less. The site would
not be situated closer than
0.5 mi (0.8 km) to existing
residential areas or 1 mi
(1.6 km) to sensitive land
uses such as Federal, State,
or local parks; wildlife
refuges; conservation lands;
Wild and Scenic Rivers; or
Natural Heritage Rivers. The
maximum proposed building and
structure height is no more
than 50 ft (15.2 m), except
that the maximum height is
200 ft (61 m) for proposed
meteorological towers and 100
ft (30.5 m) for transmission
line poles/towers and
mechanical draft cooling
towers. The proposed project
structures would not be
visible from Federal or State
parks or wilderness areas
designated as Class 1 under
section 162 of the Clean Air
Act (42 U.S.C. 7472); or as a
Wild and Scenic River, a
Natural Heritage River, or a
river of similar State
designation.
Visual Impacts from Transmission 1 SMALL....................... New offsite ROWs for
Lines. transmission lines,
pipelines, or access roads
would be no more than 100 ft
(30.5 m) in width and total
no more than 1 mi (1.6 km) in
length. No transmission line
structures (poles or towers)
would be over 100 ft (30.5 m)
in height. The new offsite
ROWs would not be situated
closer than 1 mi (1.6 km) to
existing residential areas or
sensitive land uses such as
Federal, State, or local
parks; wildlife refuges;
conservation lands; Wild and
Scenic Rivers; or Natural
Heritage Rivers. Any proposed
new structures on offsite
ROWs would not be visible
from Federal or State parks
or wilderness areas
designated as Class 1 under
section 162 of the Clean Air
Act (42 U.S.C. 7472); or as a
Wild and Scenic River, a
Natural Heritage River, or a
river of similar State
designation. Operation:
Visual Impacts During Operations.. 1 SMALL....................... The site would not be situated
closer than 1 mi (1.6 km) to
existing residential areas or
sensitive land uses such as
Federal, State, or local
parks; wildlife refuges;
conservation lands; Wild and
Scenic Rivers; or Natural
Heritage Rivers. The maximum
proposed building and
structure height would be no
more than 50 ft (15.2 m),
except that the maximum
height would be 200 ft (61 m)
for proposed meteorological
towers and 100 ft (30.5 m)
for proposed transmission
line poles/towers and
proposed mechanical draft
cooling towers. The proposed
project structures would not
be visible from Federal or
State parks or wilderness
areas designated as Class 1
under section 162 of the
Clean Air Act (42 U.S.C.
7472); or as a Wild and
Scenic River, a Natural
Heritage River, or a river of
similar State designation. If
needed, cooling towers would
be mechanical draft, not
natural draft; less than 100
ft (30.5 m) in height; and
equipped with drift
eliminators. Any makeup water
for the cooling towers would
be fresh water (less than 1
ppt salinity).
Meteorology and Air Quality
Construction:
Emissions of Criteria Pollutants 1 SMALL....................... The site size is 100 ac (40.5
and Dust During Construction. ha) or less. The permanent
footprint of disturbance is
30 ac (12.1 ha) or less of
vegetated lands and the
temporary footprint of
disturbance is an additional
20 ac (8.1 ha) or less of
vegetated land. New offsite
ROWs for transmission lines,
pipelines, or access roads
would be no longer than 1 mi
(1.6 km) and have a maximum
ROW width of 100 ft (30.5 m).
Criteria pollutants emitted
from vehicles and standby
power equipment during
construction are less than
Clean Air Act de minimis
levels set by the U.S.
Environmental Protection
Agency (EPA) if the site is
located in a nonattainment or
maintenance area, or the site
is located in an attainment
area. The site is not located
within 1 mi (1.6 km) of a
mandatory Class I Federal
area where visibility is an
important value. The level of
service (LOS) determination
for affected roadways does
not change. Mitigation
necessary to rely on the
generic analysis includes
implementation of BMPs for
dust control. Compliance with
air permits under State and
Federal laws that address the
impact of air emissions
during construction.
Greenhouse Gas Emissions During 1 SMALL....................... Greenhouse gases emitted by
Construction. equipment and vehicles during
the 97-year greenhouse gas
life-cycle period would be
equal to or less than
2,534,000 metric tons [MT] of
carbon dioxide equivalent
[CO2(e)]. Appendix H of NUREG-
2249, “Generic Environmental
Impact Statement for
Licensing of New Nuclear
Reactors” contains the NRC's
methodology for developing
this value, which includes
emissions from construction,
operation, and
decommissioning. As long as
this total value is met, the
impacts for the life cycle of
the project and the
individual phases of the
project are determined to be
SMALL. Operation:
Emissions of Criteria and 1 SMALL....................... Criteria pollutants emitted
Hazardous Air Pollutants during from vehicles and standby
Operation. power equipment during
operations are less than
Clean Air Act de minimis
levels set by the EPA if
located in a nonattainment or
maintenance area. The site is
not located within 1 mi (1.6
km) of a mandatory Class I
Federal area where visibility
is an important value. The
LOS determination for
affected roadways does not
change. Compliance with air
permits under State and
Federal laws that address the
impact of air emissions.
Hazardous air pollutant (HAP)
emissions will be within
regulatory limits.
Greenhouse Gas Emissions During 1 SMALL....................... Greenhouse gases emitted by
Operation. equipment and vehicles during
the 97-year greenhouse gas
life-cycle period would be
equal to or less than
2,534,000 MT of CO2(e).
Appendix H of NUREG-2249
contains the NRC's
methodology for developing
this value, which includes
emissions from construction,
operation, and
decommissioning. As long as
this total value is met, the
impacts for the life cycle of
the project and the
individual phases of the
project are determined to be
SMALL.
Cooling-System Emissions.......... 1 SMALL....................... If needed, cooling towers
would be mechanical draft,
not natural draft. Cooling
towers would be equipped with
drift eliminators. The site
is not located within 1 mi
(1.6 km) of a mandatory Class
I Federal area where
visibility is an important
value. Mechanical draft
cooling towers would be less
than 100 ft (30.5 m) tall.
Makeup water would be fresh
(with a salinity less than 1
ppt). Operation of cooling
towers is assumed to be
subject to State permitting
requirements. HAP emissions
would be within regulatory
limits. No existing
residential areas within 0.5
mi (0.8 km) of the site.
Emissions of Ozone and Nitrogen 1 SMALL....................... The transmission line voltage
Oxides during Transmission Line would be no higher than 1,200
Operation. kilovolts [kV].
Water Resources
Construction:
Surface Water Use Conflicts during 1 SMALL....................... Total Plant Water Demand Less
Construction. than or equal to a daily
average of 6,000 gallons per
minute [gpm] (0.379 cubic
meters per second [m\3\/s]).
If water is obtained from a
flowing water body, then the
following plant parameter
envelope/site parameter
envelope (PPE/SPE) parameter
and associated assumptions
also apply: Average plant
water withdrawals do not
reduce discharge from the
flowing water body by more
than 3 percent of the 95
percent exceedance daily flow
and do not prevent the
maintenance of applicable
instream flow requirements.
The 95 percent exceedance
flow accounts for existing
and planned future
withdrawals. Water
availability is demonstrated
by the ability to obtain a
withdrawal permit issued by
State, regional, or Tribal
governing authorities. Water
rights for the withdrawal
amount are obtainable, if
needed. If water is obtained
from a non-flowing water
body, then the following PPE/
SPE parameter and associated
value and assumptions also
apply: Water availability of
the Great Lakes, the Gulf of
America, oceans, estuaries,
and intertidal zones exceeds
the amount of water required
by the plant. Water
availability is demonstrated
by the ability to obtain a
withdrawal permit issued by
State, regional, or Tribal
governing authorities. Water
rights for the withdrawal
amount are obtainable, if
needed. The Coastal Zone
Management Act consistency
determination is obtainable,
if applicable, for the non-
flowing water body.
Groundwater Use Conflicts due to 1 SMALL....................... The long-term dewatering
Excavation Dewatering. withdrawal rate is less than
or equal to 50 gpm (0.003
m\3\/s) (the initial rate may
be larger). Dewatering
results in negligible
groundwater level drawdown at
the site boundary.
Groundwater Use Conflicts due to 1 SMALL....................... Groundwater withdrawal for all
Construction-Related Groundwater plant uses (excluding
Withdrawals. dewatering) is less than or
equal to 50 gpm (0.003 m\3\/
s). Withdrawal results in no
more than 1 ft (0.3 m) of
groundwater level drawdown at
the site boundary.
Withdrawals are not derived
from an EPA-designated Sole
Source Aquifer (SSA), or from
any aquifer designated by a
State, Tribe, or regional
authority to have special
protections to limit
drawdown. Withdrawals meet
any applicable State or local
permit requirements.
Water Quality Degradation due to 1 SMALL....................... The permanent footprint of
Construction-Related Discharges. disturbance includes 30 ac
(12.1 ha) or less of
vegetated lands, and the
temporary footprint of
disturbance includes no more
than an additional 20 ac (8.1
ha) or less of vegetated
lands. Adherence to
requirements in National
Pollutant Discharge
Elimination System (NPDES)
permits issued by the EPA or
State permitting program, and
any other applicable permits.
The long-term groundwater
dewatering withdrawal rate is
less than or equal to 50 gpm
(0.003 m\3\/s). Dewatering
discharge has minimal effects
on the quality of the
receiving water body (e.g.,
as demonstrated by
conformance with NPDES permit
requirements). There are no
planned discharges to the
subsurface (by infiltration
or injection), including
stormwater discharge.
Water Quality Degradation due to 1 SMALL....................... The site size is 100 ac (40.5
Inadvertent Spills during ha) or less. The permanent
Construction. footprint of disturbance
includes 30 ac (12.1 ha) or
less of vegetated lands, and
the temporary footprint of
disturbance includes no more
than an additional 20 ac (8.1
ha) or less of vegetated
lands. Applicable
requirements and guidance on
spill prevention and control
are followed, including
relevant BMPs and Integrated
Pollution Prevention Plans
(IPPPs).
Water Quality Degradation due to 1 SMALL....................... Groundwater Withdrawal for
Groundwater Withdrawal. Excavation or Foundation
Dewatering. The long-term
dewatering withdrawal rate is
less than or equal to 50 gpm
(0.003 m\3\/s) (the initial
rate may be larger).
Dewatering results in
negligible groundwater level
drawdown at the site
boundary. Groundwater
Withdrawal for Plant Uses
Groundwater withdrawal for
all plant uses (excluding
dewatering) is less than or
equal to 50 gpm (0.003 m\3\/
s). Withdrawal results in no
more than 1 ft (0.3 m) of
groundwater level drawdown at
the site boundary.
Withdrawals are not derived
from an EPA-designated SSA,
or from any aquifer
designated by a State, Tribe,
or regional authority to have
special protections to limit
drawdown. Withdrawals meet
any applicable State or local
permit requirements.
Water Quality Degradation due to 1 SMALL....................... In-water structures (including
Offshore or In-Water Construction intake and discharge
Activities. structures) are constructed
in compliance with provisions
of the Clean Water Act (CWA)
section 404 (33 U.S.C. 1344)
and section 10 of the Rivers
and Harbors Appropriation Act
of 1899 (33 U.S.C. 401 et
seq.). Adverse effects of
building activities
controlled and localized
using BMPs such as
installation of turbidity
curtains or installation of
cofferdams. Construction
duration would be less than 7
years.
Water Use Conflict Due to Plant 1 SMALL....................... The amount available from
Municipal Water Demand. municipal water systems
exceeds the amount of
municipal water required by
the plant (gpm). Municipal
Water Availability accounts
for all existing and planned
future uses. An agreement or
permit for the usage amount
can be obtained from the
municipality.
Degradation of Water Quality from 1 SMALL....................... Municipal Systems' Available
Plant Effluent Discharges to Capacity to Receive and Treat
Municipal Systems. Plant Effluent accounts for
all existing and reasonably
foreseeable future
discharges. Agreement to
discharge to a municipal
treatment system is
obtainable. Operation:
Surface Water Use Conflicts during 1 SMALL....................... Total plant water demand is
Operation due to Water Withdrawal less than or equal to a daily
from Flowing Waterbodies. average of 6,000 gpm (0.379
m\3\/s). Average plant water
withdrawals do not reduce
discharge from the flowing
water body by more than 3
percent of the 95 percent
exceedance daily flow and do
not prevent the maintenance
of applicable instream flow
requirements. The 95 percent
exceedance flow accounts for
existing and planned future
withdrawals. Water
availability is demonstrated
by the ability to obtain a
withdrawal permit issued by
State, regional, or Tribal
governing authorities. Water
rights for the withdrawal
amount are obtainable, if
needed.
Surface Water Use Conflicts during 1 SMALL....................... Total plant water demand is
Operation due to Water Withdrawal less than or equal to a daily
from Non-flowing Waterbodies. average of 6,000 gpm (0.379
m\3\/s). Water availability
of the Great Lakes, the Gulf
of America, oceans,
estuaries, and intertidal
zones exceeds the amount of
water required by the plant.
Water availability is
demonstrated by the ability
to obtain a withdrawal permit
issued by State, regional, or
Tribal governing authorities.
Water rights for the
withdrawal amount are
obtainable, if needed.
Coastal Zone Management Act
of 1972 (16 U.S.C. 1451 et
seq.) consistency
determination is obtainable,
if applicable.
Groundwater Use Conflicts Due to 1 SMALL....................... The long-term dewatering
Building Foundation Dewatering. withdrawal rate is less than
or equal to 50 gpm (0.003
m\3\/s) (the initial rate may
be larger). Dewatering
results in negligible
groundwater level drawdown at
the site boundary.
Groundwater Use Conflicts Due to 1 SMALL....................... Groundwater withdrawal for all
Groundwater Withdrawals for Plant plant uses (excluding
Uses. dewatering) is less than or
equal to 50 gpm (0.003 m\3\/
s). Withdrawal results in no
more than 1 ft (0.3 m) of
groundwater level drawdown at
the site boundary.
Withdrawals are not derived
from an EPA-designated SSA,
or from any aquifer
designated by a State, Tribe,
or regional authority to have
special protections to limit
drawdown. Withdrawals meet
any applicable State or local
permit requirements.
Surface Water Quality Degradation 1 SMALL....................... Total plant water demand is
Due to Physical Effects from less than or equal to a daily
Operation of Intake and Discharge average of 6,000 gpm (0.379
Structures. m\3\/s). Adhere to best
available technology
requirements of CWA 316(b)
(33 U.S.C. 1326). Operated in
compliance with CWA section
316(b) and 40 CFR 125.83,
including compliance with
monitoring and recordkeeping
requirements in 40 CFR 125.87
and 40 CFR 125.88,
respectively (40 CFR part
125). Best available
technologies are employed in
the design and operation of
intake and discharge
structures to minimize
alterations due to scouring,
sediment transport, increased
turbidity, and erosion.
Adherence to requirements in
NPDES permits issued by the
EPA or a given State. If
water is obtained from a
flowing water body, then the
following PPE/SPE parameter
and associated value also
apply: The average rate of
plant withdrawal does not
exceed 3 percent of the 95
percent exceedance daily flow
for the water body. If water
is obtained from a non-
flowing water body, then the
following PPE/SPE parameters
and associated values and
assumptions also apply: Water
availability of the Great
Lakes, the Gulf of America,
oceans, estuaries, and
intertidal zones exceeds the
amount of water required by
the plant.
Surface Water Quality Degradation 1 SMALL....................... Total plant water demand is
Due to Changes in Salinity less than or equal to a daily
Gradients Resulting from average of 6,000 gpm (0.379
Withdrawals. m\3\/s). If water is obtained
from a flowing water body,
then the following PPE/SPE
parameter and associated
assumptions also apply:
Average plant water
withdrawals do not reduce
discharge from the flowing
water body by more than 3
percent of the 95 percent
exceedance daily flow and do
not prevent the maintenance
of applicable instream flow
requirements. The 95 percent
exceedance flow accounts for
existing and planned future
withdrawals. Water
availability is demonstrated
by the ability to obtain a
withdrawal permit issued by
State, regional, or Tribal
governing authorities. Water
rights for the withdrawal
amount are obtainable, if
needed. If withdrawals are
from an estuary or intertidal
zone, then changes to
salinity gradients are within
the normal tidal or seasonal
movements that characterize
the water body. If water is
obtained from a non-flowing
water body, then the
following PPE/SPE parameter
and associated values and
assumptions also apply: Water
availability of the Great
Lakes, the Gulf of America,
oceans, estuaries, and
intertidal zones exceeds the
amount of water required by
the plant. Water availability
is demonstrated by the
ability to obtain a
withdrawal permit issued by
State, regional, or Tribal
governing authorities. Water
rights for the withdrawal
amount are obtainable, if
needed. If withdrawals are
from an estuary or intertidal
zone, then changes to
salinity gradients are within
the normal tidal or seasonal
movements that characterize
the water body.
Surface Water Quality Degradation 2 Undetermined................ The NRC determined that a
Due to Chemical and Thermal generic analysis to determine
Discharges. operational impacts on
surface water quality due to
chemical and thermal
discharges was not possible
because (1) some States may
impose effluent constituent
limitations more stringent
that those required by the
EPA, (2) limitations imposed
on effluent constituents may
vary among States, and (3)
the establishment of a mixing
zone may be required. Because
all of these issues related
to degradation of surface
water quality from chemical
and thermal discharges
require consideration of
project-specific information,
a project-specific assessment
should be performed in the
supplemental environmental
impact statement.
Groundwater Quality Degradation 1 SMALL....................... The plant is outside the
Due to Plant Discharges. recharge area for any EPA-
designated SSA, or any
aquifer designated to have
special protections by a
State, Tribal, or regional
authority. The plant is
outside the wellhead
protection area or designated
contributing area for any
public water supply well.
There are no planned
discharges to the subsurface
(by infiltration or
injection).
Water Quality Degradation due to 1 SMALL....................... Applicable requirements and
Inadvertent Spills and Leaks guidance on spill prevention
during Operation. and control are followed,
including relevant BMPs and
IPPPs. There are no planned
discharges to the subsurface
(by infiltration or
injection), including
stormwater discharge. A
groundwater protection
program conforming to
currently applicable industry
guidance is established and
followed. The site size is
100 ac (40.5 ha) or less. Use
of BMPs for soil erosion,
sediment control, and
stormwater management.
Adherence to requirements in
NPDES permits issued by the
EPA or a given State, and any
other applicable permits.
Water Quality Degradation due to 1 SMALL....................... The long-term dewatering
Groundwater Withdrawals. withdrawal rate is less than
or equal to 50 gpm (0.003
m\3\/s) (the initial rate may
be larger). Dewatering
results in negligible
groundwater level drawdown at
the site boundary.
Groundwater withdrawal for
all plant uses (excluding
dewatering) is less than or
equal to 50 gpm (0.003 m\3\/
s). Withdrawal results in no
more than 1 ft (0.3 m) of
groundwater level drawdown at
the site boundary.
Withdrawals are not derived
from an EPA-designated SSA,
or from any aquifer
designated by a State, Tribe,
or regional authority to have
special protections to limit
drawdown. Withdrawals meet
any applicable State or local
permit requirements.
Water Use Conflict from Plant 1 SMALL....................... Usage amount is within the
Municipal Water Demand. existing capacity of the
system(s), accounting for all
existing and planned future
uses. An agreement or permit
for the usage amount can be
obtained from the
municipality.
Degradation of Water Quality from 1 SMALL....................... Municipal Systems' Available
Plant Effluent Discharges to Capacity to Receive and Treat
Municipal Systems. Plant Effluent accounts for
all existing and reasonably
foreseeable future
discharges. Agreement to
discharge to a municipal
treatment system is
obtainable.
Terrestrial Ecology
Construction:
Permanent and Temporary Loss, 1 SMALL....................... The permanent footprint of
Conversion, Fragmentation, and disturbance would include 30
Degradation of Habitats. ac (12.1 ha) or less of
vegetated lands, and the
temporary footprint of
disturbance would include no
more than an additional 20 ac
(8.1 ha) or less of vegetated
lands. Temporarily disturbed
lands would be revegetated
using regionally indigenous
vegetation once the lands are
no longer needed to support
building activities. New
offsite ROWs for transmission
lines, pipelines, or access
roads would be no more than
100 ft (30.5 m) in width and
total no more than 1 mi (1.6
km) in length. The footprint
of disturbance (permanent and
temporary) would contain no
ecologically sensitive
features such as floodplains,
shorelines, riparian
vegetation, late-successional
vegetation, land specifically
designated for conservation,
or habitat known to be
potentially suitable for one
or more Federal or State
threatened or endangered
species. Total wetland
impacts from use of the site
and any offsite ROWs would be
no more than 0.5 ac (0.2 ha).
Applicants would demonstrate
an effort to minimize
fragmentation of terrestrial
habitats by using existing
ROWs, or widening existing
ROWs, to the extent
practicable. BMPs would be
used for erosion, sediment
control, and stormwater
management.
Permanent and Temporary Loss and 1 SMALL....................... Applicant would provide a
Degradation of Wetlands. delineation of potentially
impacted wetlands, including
wetlands not under CWA
jurisdiction. Total wetland
impacts from use of the site
and any offsite ROWs would be
no more than 0.5 ac (0.2 ha).
If activities regulated under
the CWA are performed, those
activities would receive
approval under one or more
nationwide permits (NWPs) (33
CFR part 330) or other
general permits recognized by
the U.S. Army Corps of
Engineers. Temporary
groundwater withdrawals for
excavation or foundation
dewatering would not exceed a
long-term rate of 50 gpm
(0.003 m\3\/s). Applicants
would be able to demonstrate
that the temporary
groundwater withdrawals would
not substantially alter the
hydrology of wetlands
connected to the same
groundwater resource. Any
required State or local
permits for wetland impacts
would be obtained. Any
mitigation measures indicated
in the NWPs or other permits
would be implemented. BMPs
would be used for erosion,
sediment control, and
stormwater management.
Effects of Building Noise on 1 SMALL....................... Noise generation would not
Wildlife. exceed 85 A-weighted decibels
[dBA] 50 ft (15.2 m) from the
source.
Effects of Vehicular Collisions on 1 SMALL....................... The site size would be 100 ac
Wildlife. (40.5 ha) or less. The
permanent footprint of
disturbance would include 30
ac (12.1 ha) or less of
vegetated lands, and the
temporary footprint of
disturbance would include no
more than an additional 20 ac
(8.1 ha) or less of vegetated
lands. There would be no
decreases in the LOS
designation for affected
roadways. The licensee would
communicate with Federal and
State wildlife agencies and
implement mitigation actions
recommended by those agencies
to reduce potential for
vehicular injury to wildlife.
Bird Collisions and Injury from 1 SMALL....................... The site size would be 100 ac
Structures and Transmission Lines. (40.5 ha) or less. New
offsite ROWs for transmission
lines, pipelines, or access
roads would be no more than
100 ft (30.5 m) in width and
total no more than 1 mi (1.6
km) in length. No
transmission line structures
(poles or towers) would be
more than 100 ft (30.5 m) in
height. Licensees would
implement common mitigation
measures such as those
provided by the American Bird
Conservancy for buildings, by
the U.S. Fish and Wildlife
Service (FWS) for towers, and
by the Avian Power Line
Interaction Committee (APLIC)
for transmission lines.
Important Species and Habitats-- 2 Undetermined................ The NRC is unable to determine
Resources Regulated under the the significance of potential
Endangered Species Act of 1973 impacts without consideration
(ESA; 16 U.S.C. 1531 et seq.). of project-specific factors,
including the specific
species and habitats affected
and the types of ecological
changes potentially resulting
from each specific licensing
action.
Important Species and Habitats-- 1 SMALL....................... Applicants would communicate
Other Important Species and with State natural resource
Habitats. or conservation agencies
regarding wildlife and plants
and implement mitigation
recommendations of those
agencies. Operation:
Permanent and Temporary Loss or 1 SMALL....................... Temporarily disturbed lands
Disturbance of Habitats. would be revegetated using
regionally indigenous
vegetation once the lands are
no longer needed to support
building activities. The
total wetland loss from site
disturbance over the
operational life of the plant
would be no more than 0.5 ac
(0.2 ha). Any State or local
permits for wetland impacts
would be obtained. Any
mitigation measures indicated
in the NWPs or other wetland
permits would be implemented.
BMPs would be used for
erosion, sediment control,
and stormwater management.
Effects of Operational Noise on 1 SMALL....................... Noise generation would not
Wildlife. exceed 85 dBA 50 ft (15.2 m)
from the source. There would
be no decreases in the LOS
designation for affected
roadways. The licensee would
communicate with Federal and
State wildlife agencies and
implement mitigation actions
recommended by those agencies
to reduce potential for
vehicular injury to wildlife.
Effects of Vehicular Collisions on 1 SMALL....................... Noise generation would not
Wildlife. exceed 85 dBA 50 ft (15.2 m)
from the source. There would
be no decreases in the LOS
designation for affected
roadways. The licensee would
communicate with Federal and
State wildlife agencies and
implement mitigation actions
recommended by those agencies
to reduce potential for
vehicular injury to wildlife.
Exposure of Terrestrial Organisms 1 SMALL....................... Applicants would demonstrate
to Radionuclides. in their application that any
radiological nonhuman biota
doses would be below
International Atomic Energy
Agency (IAEA) and National
Council on Radiation
Protection and Measurements
(NCRP) guidelines.
Cooling-Tower Operational Impacts 1 SMALL....................... If needed, cooling towers
on Vegetation. would be mechanical draft,
not natural draft; less than
100 ft (30.5 m) in height;
and equipped with drift
eliminators. Any makeup water
for the cooling towers would
be fresh water (less than 1
ppt salinity).
Bird Collisions and Injury from 1 SMALL....................... The site size would be 100 ac
Structures and Transmission Lines. (40.5 ha) or less. New
offsite ROWs for transmission
lines, pipelines, or access
roads would be no more than
100 ft (30.5 m) in width and
total no more than 1 mi (1.6
km) in length. No
transmission line structures
(poles or towers) would be
more than 100 ft (30.5 m) in
height. Licensees would
implement common mitigation
measures such as those
provided by the American Bird
Conservancy for buildings, by
the FWS for towers, and by
the APLIC for transmission
lines.
Bird Electrocutions from 1 SMALL....................... New offsite ROWs for
Transmission Lines. transmission lines,
pipelines, or access roads
would be no more than 100 ft
(30.5 m) in width and total
no more than 1 mi (1.6 km) in
length. Common mitigation
measures, such as those
recommended by APLIC, would
be implemented.
Water Use Conflicts with 1 SMALL....................... Total plant water demand would
Terrestrial Resources. be less than or equal to a
daily average of 6,000 gpm
(0.379 m\3\/s). If water is
withdrawn from flowing water
bodies, average plant water
withdrawals would not reduce
flow by more than 3 percent
of the 95 percent exceedance
daily flow and would not
prevent maintenance of
applicable instream flow
requirements. Any water
withdrawals would be in
compliance with any EPA or
State permitting
requirements. Applicants
would be able to demonstrate
that hydroperiod changes are
within historical or seasonal
fluctuations.
Effects of Transmission Line ROW 1 SMALL....................... Vegetation in transmission
Management on Terrestrial line ROWs would be managed
Resources. following a plan consisting
of integrated vegetation
management practices. All ROW
maintenance work would be
performed in compliance with
all applicable laws and
regulations. Herbicides would
be applied by licensed
applicators, and only if in
compliance with applicable
manufacturer label
instructions.
Effects of Electromagnetic Fields 1 SMALL....................... Based on the literature review
on Flora and Fauna. in the License Renewal
Generic Environmental Impact
Statement (LR GEIS), the NRC
determined that this is a
Category 1 issue and impacts
would be SMALL regardless of
the length, location, or size
of the transmission lines.
The NRC did not recommend any
mitigation in the LR GEIS;
hence, none is needed here.
The NRC did not rely on any
PPE and SPE values or
assumptions in reaching this
conclusion.
Important Species and Habitats-- 2 Undetermined................ The NRC is unable to determine
Resources Regulated under the ESA the significance of potential
of 1973. impacts without consideration
of project-specific factors,
including the specific
species and habitats affected
and the types of ecological
changes potentially resulting
from each specific licensing
action.
Important Species and Habitats-- 1 SMALL....................... Applicants would communicate
Other Important Species and with State natural resource
Habitats. or conservation agencies
regarding wildlife and plants
and implement mitigation
recommendations of those
agencies.
Aquatic Ecology
Construction:
Runoff and sedimentation from 1 SMALL....................... BMPs would be used for erosion
construction areas. and sediment control.
Temporarily disturbed lands
would be revegetated using
regionally indigenous
vegetation once the lands are
no longer needed to support
building activities.
Dredging and filling aquatic 1 SMALL....................... Applicant would obtain
habitats to build intake and approval, if required, under
discharge structures. NWP 7 in 33 CFR part 330.
Applicant would implement any
mitigation required under NWP
7 in 33 CFR part 330.
Applicant would minimize any
temporarily disturbed
shoreline and riparian lands
needed to build the intake
and discharge structures and
restore those areas with
regionally indigenous
vegetation suited to those
landscape settings once the
disturbances are no longer
needed. BMPs would be used
for erosion and sediment
control.
Building transmission lines, 1 SMALL....................... If activities regulated under
pipelines, and access roads the CWA are performed, they
across surface waterbodies. would receive approval under
one or more NWPs (33 CFR part
330) or other general permits
recognized by the U.S. Army
Corps of Engineers. Pipelines
would be extended under (or
over) surface through
directional drilling without
physically disturbing
shorelines or bottom
substrate. Access roads would
span streams and other
surface waterbodies with a
bridge or ford, and any fords
would include placement and
maintenance of matting to
minimize physical disturbance
of shorelines and bottom
substrates. No access roads
would be extended across
stream channels over 10 ft (3
m) in width (at ordinary high
water). Any bridges or fords
would be removed once no
longer needed, and any
exposed soils or substrate
would be revegetated using
regionally indigenous
vegetation appropriate to the
landscape setting. Any
mitigation measures indicated
in the NWPs or other permits
would be implemented. BMPs
would be used for erosion and
sediment control.
Important Species and Habitats-- 2 Undetermined................ The NRC is unable to determine
Resources Regulated under the ESA the significance of potential
and Magnuson-Stevens Fishery impacts without consideration
Conservation and Management Act of project-specific factors,
(16 U.S.C.1801 et seq.). including the specific
species and habitats affected
and the types of ecological
changes potentially resulting
from each specific licensing
action. Furthermore, the
Endangered Species Act (16
U.S.C. 1531 et seq.) and
Magnuson-Stevens Fishery
Conservation and Management
Act (16 U.S.C. 1801 et seq.)
require consultations for
each licensing action that
may affect regulated
resources.
Important species and habitats-- 1 SMALL....................... Applicants would communicate
Other Important Species and with State natural resource
Habitats. or conservation agencies
regarding aquatic fish,
wildlife, and plants and
implement mitigation
recommendation of those
agencies. Operation:
Stormwater runoff................. 1 SMALL....................... Preparation, approval by
applicable regulatory
agencies, and implementation
of a stormwater management
plan. Obtaining and
compliance with any required
permits for the storage and
use of hazardous materials
issued by Federal and State
agencies under Resource
Conservation and Recovery Act
(RCRA). BMPs would be used
for stormwater management.
Exposure of aquatic organisms to 1 SMALL....................... Applicants would demonstrate
radionuclides. in their application that any
radiological nonhuman biota
doses would be below IAEA and
NCRP guidelines.
Effects of refurbishment on 1 SMALL....................... BMPs would be used for
aquatic biota. erosion, sediment control,
and stormwater management.
Exposed soils would be
restored as soon as possible
with regionally indigenous
vegetation.
Effects of maintenance dredging on 1 SMALL....................... If activities regulated under
aquatic biota. the CWA are performed, those
activities would receive
approval under one or more
NWPs (33 CFR part 330) or
other general permits
recognized by the U.S. Army
Corps of Engineers. Any
mitigation measures indicated
in the NWPs or other permits
would be implemented. BMPs
would be used for erosion and
sediment control.
Impacts of transmission line ROW 1 SMALL....................... Vegetation in transmission
management on aquatic resources. line ROWs would be managed
following a plan consisting
of integrated vegetation
management practices. All ROW
maintenance work would be
performed in compliance with
all applicable laws and
regulations. Herbicides would
be applied by licensed
applicators, and only if in
compliance with applicable
manufacturer label
instructions. BMPs would be
used for erosion and sediment
control.
Impingement and entrainment of 1 SMALL....................... Intakes would comply with
aquatic organisms. regulatory requirements
established by EPA in 40 CFR
125.84 to be protective of
fish and shellfish. Best
available control technology
would be employed in the
design of intakes to minimize
entrainment and impingement,
such as use of screens and
intake rates recognized to
minimize effects.
Thermal impacts on aquatic biota.. 2 Undetermined................ The NRC would have to first
review the discharge plume
analysis (as described in
section 3.4) and the aquatic
biota potentially present
before being able to reach a
conclusion regarding the
possible significance of
impacts to that biota.
Other effects of cooling-water 2 Undetermined................ The NRC would have to first
discharges on aquatic biota. review the discharge plume
analysis (as described in
section 3.4) and the aquatic
biota potentially present
before being able to reach a
conclusion regarding the
possible significance of
impacts to that biota.
Water use conflicts with aquatic 1 SMALL....................... If needed, cooling towers
resources. would be mechanical draft,
not natural draft; less than
100 ft (30.5 m) in height;
and equipped with drift
eliminators. Any makeup water
for the cooling towers would
be fresh water (less than 1
ppt salinity). Total plant
water demand would be less
than or equal to a daily
average of 6,000 gpm (0.379
m\3\/s). If water is
withdrawn from flowing
waterbodies, average plant
water withdrawals would not
reduce flow by more than 3
percent of the 95 percent
exceedance daily flow and
would not prevent maintenance
of applicable instream flow
requirements. Any water
withdrawals would be in
compliance with any EPA or
State permitting
requirements. Applicants
would be able to demonstrate
that hydroperiod changes are
within historical or seasonal
fluctuations.
Important Species and Habitats-- 2 Undetermined................ The NRC is unable to determine
Resources Regulated under the ESA the significance of potential
and Magnuson-Stevens Fishery impacts without consideration
Conservation and Management Act. of project-specific factors,
including the specific
species and habitats affected
and the types of ecological
changes potentially resulting
from each specific licensing
action. Furthermore, the
Endangered Species Act (16
U.S.C. 1531 et seq.) and
Magnuson-Stevens Fishery
Conservation and Management
Act (16 U.S.C. 1801 et seq.)
require consultations for
each licensing action that
may affect regulated
resources.
Important species and habitats-- 1 SMALL....................... Applicants would communicate
Other Important Species and with State natural resource
Habitats. or conservation agencies
regarding aquatic fish,
wildlife, and plants and
implement mitigation
recommendations of those
agencies.
Historic and Cultural Resources
Construction:
Construction impacts on historic 2 Undetermined................ Impacts on historic and
and cultural resources. cultural resources are
analyzed on a project-
specific basis. The NRC will
perform a National
Environmental Policy Act
(NEPA) analysis and a
National Historic
Preservation Act (NHPA)
Section 106 consultation as
required, in accordance with
36 CFR part 800, including
consultation with the State
and Tribal Historic
Preservation Officers, Indian
Tribes, and other interested
parties. Operation:
Operation impacts on historic and 2 Undetermined................ Impacts on historic and
cultural resources. cultural resources are
analyzed on a project-
specific basis. The NRC will
perform a National
Environmental Policy Act
(NEPA) analysis and a
National Historic
Preservation Act (NHPA)
Section 106 consultation as
required, in accordance with
36 CFR part 800, including
consultation with the State
and Tribal Historic
Preservation Officers, Indian
Tribes, and other interested
parties.
Environmental Hazards--Radiological Environment
Construction:
Radiological dose to construction 1 SMALL....................... For protection against
workers. radiation, the applicant must
meet the regulatory
requirements of:
--10 CFR 20.1101 Radiation
Protection Programs if issued
a license
--10 CFR 20.1201 Occupational
dose limits for adults 10 CFR
20.1301 Dose limits for
individual members of the
public
--Appendix B to 10 CFR part 20
Annual Limits on Intake
(ALIs) and Derived Air
Concentrations (DACs) of
Radionuclides for
Occupational Exposure;
Effluent Concentrations;
Concentrations for Release to
Sewerage
--10 CFR 50.34a Design
objectives for equipment to
control releases of
radioactive material in
effluents--nuclear power
reactors
--10 CFR 50.36a. Technical
specifications on effluents
from nuclear power reactors
Application contains
sufficient technical
information for the staff to
complete the detailed
technical safety review.
Application will be found to
be in compliance by the NRC
with the above regulations
through a radiation
protection program and an
effluent release monitoring
program. Operation:
Occupational doses to workers..... 1 SMALL....................... For protection against
radiation, the applicant must
meet the regulatory
requirements of:
--10 CFR 20.1101 Radiation
Protection Programs if issued
a license
--10 CFR 20.1201 Occupational
dose limits for adults
--Appendix B of 10 CFR part 20
Annual Limits on Intake
(ALIs) and Derived Air
Concentrations (DACs) of
Radionuclides for
Occupational Exposure;
Effluent Concentrations;
Concentrations for Release to
Sewerage
--10 CFR 50.34a Design
objectives for equipment to
control releases of
radioactive material in
effluents--nuclear power
reactors
--10 CFR 50.36a Technical
specifications on effluents
from nuclear power reactors.
Application contains
sufficient technical
information for the staff to
complete the detailed
technical safety review.
Application will be found to
be in compliance by the NRC
with the above regulations
through a radiation
protection program and an
effluent release monitoring
program.
Maximally exposed individual 1 SMALL....................... For protection against
annual doses. radiation, the applicant must
meet the regulatory
requirements of:
--10 CFR 20.1101 Radiation
Protection Programs if issued
a license
--10 CFR 20.1301 Dose limits
for individual members of the
public
--Appendix B of 10 CFR part 20
ALIs and DACs of
Radionuclides for
Occupational Exposure;
Effluent Concentrations;
Concentrations for Release to
Sewerage
--10 CFR 50.34a Design
objectives for equipment to
control releases of
radioactive material in
effluents--nuclear power
reactors
--10 CFR 50.36a Technical
specifications on effluents
from nuclear power reactors.
Application contains
sufficient technical
information for the staff to
complete the detailed
technical safety review.
Application will be found to
be in compliance by the NRC
with the above regulations
through a radiation
protection program and an
effluent release monitoring
program.
Total population annual doses..... 1 SMALL....................... For protection against
radiation, the applicant must
meet the regulatory
requirements of:
--10 CFR 20.1101 Radiation
Protection Programs if issued
a license
--10 CFR 20.1301 Dose limits
for individual members of the
public
--Appendix B of 10 CFR part 20
ALIs and DACs of
Radionuclides for
Occupational Exposure;
Effluent Concentrations;
Concentrations for Release to
Sewerage
--10 CFR 50.34a Design
objectives for equipment to
control releases of
radioactive material in
effluents--nuclear power
reactors
--10 CFR 50.36a Technical
specifications on effluents
from nuclear power reactors.
Application contains
sufficient technical
information for the staff to
complete the detailed
technical safety review.
Application will be found to
be in compliance by the NRC
with the above regulations
through a radiation
protection program and an
effluent release monitoring
program.
Nonhuman biota doses.............. 1 SMALL....................... Applicants would demonstrate
in their application that any
radiological nonhuman biota
doses would be below IAEA and
NCRP guidelines.
Environmental Hazards--Nonradiological Environment
Construction:
Building impacts of chemical, 1 SMALL....................... The applicant must adhere to
biological, and physical all applicable Federal,
nonradiological hazards. State, local or Tribal
regulatory limits and permit
conditions for chemical
hazards, biological hazards,
and physical hazards. The
applicant will follow
nonradiological public and
occupational health BMPs and
mitigation measures, as
appropriate.
Building impacts of N/A Uncertain................... Studies of 60 hertz [Hz] EMFs
electromagnetic fields (EMFs). have not uncovered consistent
evidence linking harmful
effects with field exposures.
Because the state of the
science is currently
uncertain, no generic
conclusion on human health
impacts is possible. If, in
the future, the Commission
finds scientific information
sufficient to draw
conclusions about potential
human health impacts, the
Commission may require
applicants to submit plant-
specific reviews of these
health effects as part of
their application. Until such
time, applicants are not
required to submit
information about this issue. Operation:
Operation impacts of chemical, 1 SMALL....................... The applicant must adhere to
biological, and physical all applicable Federal,
nonradiological hazards. State, local or Tribal
regulatory limits and permit
conditions for chemical
hazards, biological hazards,
and physical hazards. The
applicant will follow
nonradiological public and
occupational health BMPs and
mitigation measures, as
appropriate.
Operation impacts of EMFs......... N/A Uncertain................... Studies of 60 Hz EMFs have not
uncovered consistent evidence
linking harmful effects with
field exposures. Because the
state of the science is
currently uncertain, no
generic conclusion on human
health impacts is possible.
If, in the future, the
Commission finds scientific
information sufficient to
draw conclusions about
potential human health
impacts, the Commission may
require applicants to submit
plant-specific reviews of
these health effects as part
of their application. Until
such time, applicants are not
required to submit
information about this issue.
Noise
Construction:
Construction-related noise........ 1 SMALL....................... The noise level would be no
more than 65 dBA at site
boundary, unless a relevant
State or local noise
abatement law or ordinance
sets a different threshold,
which would then be the
presumptive threshold for PPE
purposes. If an applicant
cannot meet the 65 dBA
threshold through mitigation,
then the applicant must
obtain a variance or
exception with the relevant
State or local regulator. The
project would implement BMPs,
such as modeling, foliage
planting, construction of
noise buffers, and the timing
of construction and/or
operation activities. Operation:
Operation-related noise........... 1 SMALL....................... The noise level would be no
more than 65 dBA at site
boundary, unless a relevant
State or local noise
abatement law or ordinance
sets a different threshold,
which would then be the
presumptive threshold for PPE
purposes. If an applicant
cannot meet the 65 dBA
threshold through mitigation,
then the applicant must
obtain a variance or
exception with the relevant
State or local regulator. The
project would implement BMPs,
such as modeling, foliage
planting, construction of
noise buffers, and the timing
of construction and/or
operation activities.
Waste Management--Radiological Waste Management
Operation:
Low-level radioactive waste (LLRW) 1 SMALL....................... Applicants must meet the
regulatory requirements of 10
CFR part 20 (e.g., 10 CFR
20.1406 and subpart K), 10
CFR part 61, 10 CFR part 71,
and 10 CFR part 72.
Quantities of LLRW generated
at a new nuclear reactor
would be less than the
quantities of LLRW generated
at existing nuclear power
plants, which generate an
average of 21,200 cubic feet
[ft\3\] (600 cubic meters
[m\3\]) and 2,000 curies [Ci]
(7.4 x 1013 becquerels [Bq])
per year for boiling water
reactors and half that amount
for pressurized water
reactors.
Onsite spent nuclear fuel 1 SMALL....................... Compliance with 10 CFR part
management. 72.
Mixed waste....................... 1 SMALL....................... RCRA Small Quantity Generator
for Mixed Waste.
Waste Management--Nonradiological Waste Management
Construction:
Construction nonradiological waste 1 SMALL....................... The applicant must meet all
the applicable permit
conditions, regulations, and
BMPs related to solid,
liquid, and gaseous waste
management. For hazardous
waste generation, applicants
must meet conformity with
hazardous waste quantity
generation levels in
accordance with RCRA. For
sanitary waste, applicants
must dispose of sanitary
waste in a permitted process.
For mitigation measures, the
applicant would perform
mitigation measures to the
extent practicable, such as
recycling, process
improvements, or the use of a
less hazardous substance. Operation:
Operation nonradiological waste... 1 SMALL....................... The applicant must meet all
the applicable permit
conditions, regulations, and
BMPs related to solid,
liquid, and gaseous waste
management. For hazardous
waste generation, applicants
must meet conformity with
hazardous waste quantity
generation levels in
accordance with RCRA. For
sanitary waste, applicants
must dispose of sanitary
waste in a permitted process.
For mitigation measures, the
applicant would perform
mitigation measures to the
extent practicable, such as
recycling, process
improvements, or the use of a
less hazardous substance.
Postulated Accidents
Operation:
Design Basis Accidents Involving 1 SMALL....................... For the exclusion area
Radiological Releases. boundary, the maximum total
effective dose equivalent for
any 2-hour period during the
radioactivity release should
be calculated. For the low-
population zone, the total
effective dose equivalent
should be calculated for the
duration of the accident
release (i.e., 30 days, or
other duration as justified).
The above calculations would
compare the design basis
accident doses with the dose
criteria given in regulations
related to the application
(e.g., 10 CFR 50.34(a)(1), 10
CFR 52.17(a)(1), and 10 CFR
52.79(a)(1)), standard review
plans (e.g., standard review
plan criteria, table 1 in
standard review plan section
15.0.3 of NUREG-0800), and
regulatory guides, (e.g., RG
1.183), as applicable.
Accidents Involving Releases of 1 SMALL....................... Reactor inventory of a
Hazardous Chemicals. regulated substance is less
than its Threshold Quantity
(TQ). TQs are found in 40 CFR
68.130, tables 1, 2, 3, and
4; and Reactor inventory of
an extremely hazardous
substance is less than its
Threshold Planning Quantity
(TPQ). TPQs are found in 40
CFR part 355, appendices A
and B.
Severe Accidents.................. 1 SMALL....................... Within the maximum population
dose risk 95th confidence
bounding value of 9.727 x
10\3\ person-rem per reactor
year (i.e., Indian Point
Energy Center Units 2 and 3)
specified in the 1996 LR GEIS
and demonstrating the
utilization of 10 CFR 50.155
or diverse and flexible
coping strategies (FLEX) to
address mitigation of beyond-
design-basis events; or
Within the maximum 10- and
150-mile Exposure Index at
the 95th confidence bounding
value of 1.896 x 10\4\ and
2.864 x 10\6\, respectively
(i.e., Indian Point Energy
Center Units 2 and 3)
specified in the 1996 LR GEIS
and demonstrating the
utilization of 10 CFR 50.155
or FLEX to address mitigation
of beyond-design-basis
events; or Utilizing the
source term from 10 CFR
50.34(a)(1)(ii)(D), or the
equivalent 10 CFR 52
regulation, with a non-intact
containment or confinement
for population density
assessments under 10 CFR
100.21(h) to demonstrate a
calculated total effective
dose equivalent (TEDE) of no
greater than 1 rem over a
period of 30 days and that no
further mitigation is
necessary because health
effects are shown not to be
significant or a new reactor
that is co-located with an
existing LWR may compare its
source terms to demonstrate
that the LWR's severe
accident risks bounds the new
reactor's risks; or Utilizing
10 CFR 50.33(g)(2) to
demonstrate there is no plume
exposure pathway emergency
planning zone where the
projected total effective
dose equivalent exceeds 1 rem
over 96 hours (i.e., 10 CFR
50.33(g)(2)(i)(A)) and no
further mitigation is
necessary because health
effects are shown not to be
significant. Acts of Terrorism..................... 1 SMALL....................... The environmental impacts of
acts of terrorism and
sabotage only need to be
addressed if a reactor
facility is subject to the
jurisdiction of the U.S.
Court of Appeals for the
Ninth Circuit.
Socioeconomics
Construction:
Community Services and 1 SMALL....................... The housing vacancy rate in
Infrastructure. the affected economic region
does not change by more than
5 percent, or at least 5
percent of the housing stock
remains available after
accounting for in-migrating
construction workers.
Student:teacher ratios in the
affected economic region do
not exceed locally mandated
levels after including the
school age children of the in-
migrating worker families.
Transportation Systems and Traffic 1 SMALL....................... The LOS determination for
affected roadways does not
change. Mitigation measures
may include implementation of
traffic flow management,
management of shift-change
timing, and encouragement of
ride-sharing and use of
public transportation
options, such that LOS values
can be maintained with the
increased volumes.
Economic Impacts.................. 1 Beneficial.................. The economic impacts of
construction and operation of
a new nuclear reactor are
expected to be beneficial;
therefore, this is a Category
1 issue. If, during the
project-specific
environmental review, the NRC
determines a detailed
analysis of economic costs
and benefits is needed for
analysis of the range of
alternatives considered or
relevant to mitigation, the
NRC may require further
information from the
applicant.
Tax Revenue Impacts............... 1 Beneficial.................. The tax revenue impacts of
construction and operation of
a new nuclear reactor are
expected to be beneficial;
therefore, this is a Category
1 issue. If, during the
project-specific
environmental review, the NRC
determines a detailed
analysis of tax revenue costs
and benefits is needed for
analysis of the range of
alternatives considered or
relevant to mitigation, the
NRC may require further
information from the
applicant. Operation:
Community Services and 1 SMALL....................... The housing vacancy rate in
Infrastructure. the affected economic region
does not change by more than
5 percent, or at least 5
percent of the housing stock
remains available after
accounting for in-migrating
construction workers.
Student:teacher ratios in the
affected economic region do
not exceed locally mandated
levels after including the
school age children of the in-
migrating worker families.
Transportation Systems and Traffic 1 SMALL....................... The LOS determination for
affected roadways does not
change. Mitigation measures
may include implementation of
traffic flow management,
management of shift-change
timing, and encouragement of
ride-sharing and use of
public transportation
options, such that LOS values
can be maintained with the
increased volumes.
Economic Impacts.................. 1 Beneficial.................. The economic impacts of
construction and operation of
a nuclear reactor are
expected to be beneficial;
therefore, this is a Category
1 issue. If, during the
project-specific
environmental review, the NRC
determines a detailed
analysis of economic costs
and benefits is needed for
analysis of the range of
alternatives considered or
relevant to mitigation, the
NRC may require further
information from the
applicant.
Tax Revenue Impacts............... 1 Beneficial.................. The tax revenue impacts of
construction and operation of
a nuclear reactor are
expected to be beneficial;
therefore, this is a Category
1 issue. If, during the
project-specific
environmental review, the NRC
determines a detailed
analysis of tax revenue costs
and benefits is needed for
analysis of the range of
alternatives considered or
relevant to mitigation, the
NRC may require further
information from the
applicant.
Fuel Cycle
Operation:
Uranium Recovery.................. 1 SMALL....................... Table S-3 of 10 CFR 51.51 is
expected to bound the impacts
for new reactor fuels,
because of uranium fuel cycle
changes since WASH-1248,
including:
--Increasing use of in situ
leach uranium mining has
lower environmental impacts
than traditional mining and
milling methods.
--Current light-water reactors
(LWRs) are using nuclear fuel
more efficiently due to
higher levels of fuel burnup
resulting in less demand for
mining and milling
activities.
--Less reliance on coal-fired
electrical generation plants
is resulting in less gaseous
effluent releases from
electrical generation sources
supporting mining and milling
activities.
Must satisfy the regulatory
requirements of 10 CFR part
40, Domestic Licensing of
Source Material and 10 CFR
part 71, Packaging and
Transportation of Radioactive
Material.
Uranium Conversion................ 1 SMALL....................... Table S-3 of 10 CFR 51.51 is
expected to bound the impacts
for new reactor fuels because
of uranium fuel cycle changes
since WASH-1248, including:
Current LWRs are using
nuclear fuel more efficiently
due to higher levels of fuel
burnup resulting in less
demand for conversion
activities. Less reliance on
coal-fired electrical
generation plants is
resulting in less gaseous
effluent releases from
electrical generation sources
supporting conversion
activities. Must satisfy the
regulatory requirements of 10
CFR part 40, Domestic
Licensing of Source Material
and 10 CFR part 71, Packaging
and Transportation of
Radioactive Material, and 10
CFR part 73, Physical
Protection of Plants and
Materials.
Enrichment........................ 1 SMALL....................... Table S-3 is expected to bound
the impacts for new nuclear
reactor fuels, because of
uranium fuel cycle changes
since WASH-1248, including:
Transitioning of U.S. uranium
enrichment technology from
gaseous diffusion to gas
centrifugation, which
requires less electrical
usage per separative work
unit. Current LWRs are using
nuclear fuel more efficiently
due to higher levels of fuel
burnup resulting in less
demand for enrichment
activities. Less reliance on
coal-fired electrical
generation plants is
resulting in less gaseous
effluent releases from
electrical generation sources
supporting enrichment
activities. Must satisfy the
regulatory requirements of 10
CFR part 40, Domestic
Licensing of Source Material;
10 CFR part 70, Domestic
Licensing of Special Nuclear
Material; 10 CFR part 71,
Packaging and Transportation
of Radioactive Material; and
10 CFR part 73, Physical
Protection of Plants and
Materials.
Fuel Fabrication (excluding metal 1 SMALL....................... Table S-3 is expected to bound
fuel and liquid-fueled molten the impacts for new nuclear
salt). reactor fuels, because of
uranium fuel cycle changes
since WASH-1248, including:
Current LWRs are using
nuclear fuel more efficiently
due to higher levels of fuel
burnup resulting in fewer
discharged fuel assemblies to
be fabricated each year and
due to longer time periods
between refueling. Less
reliance on coal-fired
electrical generation plants
is resulting in less gaseous
effluent releases from
electrical generation sources
supporting fabrication. Must
satisfy the regulatory
requirements of 10 CFR part
40, Domestic Licensing of
Source Material, 10 CFR part
70, Domestic Licensing of
Special Nuclear Material, 10
CFR part 71, Packaging and
Transportation of Radioactive
Material, and 10 CFR part 73,
Physical Protection of Plants
and Materials.
Reprocessing...................... 1 SMALL....................... Table S-3 is expected to bound
the impacts for new nuclear
reactor fuels, because of
uranium fuel cycle changes
since WASH-1248, including:
Current LWRs are using
nuclear fuel more efficiently
due to higher levels of fuel
burnup resulting in fewer
discharged fuel assemblies to
be reprocessed each year.
Less reliance on coal-fired
electrical generation plants
is resulting in less gaseous
effluent releases from
electrical generation sources
supporting reprocessing.
Reprocessing capacity up to
900 metric tons of uranium
[MTU]/yr. Must satisfy the
regulatory requirements of 10
CFR part 40, Domestic
Licensing of Source Material;
10 CFR part 50, Domestic
Licensing of Production and
Utilization Facilities;10 CFR
part 70, Domestic Licensing
of Special Nuclear Material;
10 CFR part 71, Packaging and
Transportation of Radioactive
Material; 10 CFR part 72,
Licensing Requirements for
the Independent Storage of
Spent Fuel, High-Level
Radioactive Waste, and
Reactor-related Greater Than
Class C Waste; and 10 CFR
part 73, Physical Protection
of Plants and Materials.
Storage and Disposal of 1 SMALL....................... Table S-3 is expected to bound
Radiological Wastes. the impacts for new nuclear
reactor fuels, because of
uranium fuel cycle changes
since WASH-1248, including:
Current LWRs are using
nuclear fuel more efficiently
due to higher levels of fuel
burnup resulting in fewer
discharged fuel assemblies to
be stored and disposed. Less
reliance on coal-fired
electrical generation plants
is resulting in less gaseous
effluent releases from
electrical generation sources
supporting storage and
disposal. Waste and spent
fuel inventories, as well as
their associated certified
spent fuel shipping and
storage containers, are not
significantly different from
what has been considered for
LWR evaluations in NUREG-
2157. Must satisfy the
regulatory requirements of 10
CFR part 40, Domestic
Licensing of Source Material;
10 CFR part 70, Domestic
Licensing of Special Nuclear
Material; 10 CFR part 71,
Packaging and Transportation
of Radioactive Material; 10
CFR part 72, Licensing
Requirements for the
Independent Storage of Spent
Fuel, High-Level Radioactive
Waste, and Reactor-related
Greater Than Class C Waste;
and 10 CFR part 73, Physical
Protection of Plants and
Materials.
Transportation of Fuel and Waste
Operation:
Transportation of Unirradiated 1 SMALL....................... The maximum annual one-way
Fuel. shipment distance does not
exceed 59,160 km (36,760 mi).
The annual shipments
associated with the one-way
shipment distance have been
normalized to a net
electrical output of 880
megawatts electric [MW(e)],
i.e., 1,100 MW(e) with an 80
percent capacity factor from
WASH-1238. The maximum annual
round-trip shipment distance
does not exceed 118,320 km
(73,520 mi). The annual
shipments associated with the
round-trip shipment distance
have been normalized to a net
electrical output of 880
MW(e), i.e., 1,100 MW(e) with
an 80 percent capacity factor
from WASH-1238.
Transportation of Radioactive 1 SMALL....................... The maximum annual round-trip
Waste. shipment distance does not
exceed 293,145 km (182,152
mi). The annual shipments
associated with the round-
trip shipment distance have
been normalized to a net
electrical output of 880
MW(e), i.e., 1,100 MW(e) with
an 80 percent capacity factor
and a shipment volume of 2.34
m\3\/shipment from WASH-1238.
Transportation of Irradiated Fuel. 1 SMALL....................... The maximum annual one-way
shipment distance does not
exceed 505,393 km (314,037
mi). The annual shipments
associated with the one-way
shipment distance have been
normalized to a net
electrical output of 880
MW(e), i.e., 1,100 MW(e) with
an 80 percent capacity factor
and a shipment capacity of
0.5 MTU/shipment from WASH-
1238. The maximum annual
round-trip shipment distance
does not exceed 1,010,786 km
(628,073 mi). The annual
shipments associated with the
round-trip shipment distance
have been normalized to a net
electrical output of 880
MW(e), i.e., 1,100 MW(e) with
an 80 percent capacity factor
and a shipment capacity of
0.5 MTU/shipment from WASH-
1238. A maximum assembly
averaged burnup of 80
gigawatt-days [GWd]/MTU for
UO2 fuel and peak pellet
burnup of 133 GWd/MTU for TRi-
structural ISOtropic (TRISO)
fuel.
Decommissioning
Decommissioning....................... 1 SMALL....................... The environmental impacts for
the following resource areas
were generically addressed in
NUREG-0586, Supplement 1,
would be limited to
operational areas, would not
be detectable or
destabilizing and are
expected to have a negligible
effect on the impacts of
terminating operations and
decommissioning:
--Onsite Land Use
--Water Use
--Water Quality
--Air Quality
--Aquatic Ecology within the
operational area
--Terrestrial Ecology within
the operational area
--Radiological
--Radiological Accidents (non-
spent-fuel-related)
--Occupational Issues
--Socioeconomic
--Onsite Cultural and Historic
Resources for plants where
the disturbance of lands
beyond the operational areas
is not anticipated
--Aesthetics
--Noise
--Transportation
--Irretrievable Resource
The following issues were not
addressed in NUREG-0586,
Supplement 1, but have been
determined to be Category 1
issues:
--Nonradiological waste
--Greenhouse Gases Decommissioning....................... 2 Undetermined................ Threatened and endangered
species was an issue
identified in NUREG-0586,
Supplement 1, as requiring a
project-specific review.
Four conditionally project-
specific issues identified in
NUREG-0586, Supplement 1,
will require a project-
specific review if present:
--Land use involving offsite
areas to support
decommissioning activities
--Aquatic ecology for
activities beyond the
licensed operational area
--Terrestrial ecology for
activities beyond the
licensed operational area
--Historic and cultural
resources (archaeological,
architectural, structural,
historic) for activities
within and beyond the
licensed operational area
with no current (i.e., at the
time of decommissioning)
evaluation of resources for
National Register of Historic
Places (NRHP) eligibility
Additionally, the following
two environmental resource
areas are additional
decommissioning impacts that
require project-specific
review:
--Climate Change: the effects
of climate change are
location-specific and cannot,
therefore, be evaluated
generically (see section
1.3.3.2.2, Category 2 Issues
Applying Across Resources, of
NUREG-2249)
--Cumulative: must be
considered on a project-
specific basis where impacts
would depend on regional
resource characteristics, the
resource-specific impacts of
the project, and the
cumulative significance of
other factors affecting the
resource. (see section
1.3.3.2.2, Category 2 Issues
Applying Across Resources, of
NUREG-2249).
Issues Applying Across Resources
Climate Change Impacts on 2 Undetermined................ The effects of climate change
Environmental Resources. on environmental resources
are location-specific and
cannot, therefore, be
evaluated generically. For
example, while climate change
may cause many areas to
receive less than average
annual precipitation, other
areas may see an increase in
average annual precipitation.
Therefore, applicants and the
NRC would address the effects
of climate change on
environmental resources in
the environmental documents
for new nuclear reactor
licensing. Cumulative Impacts.................... 2 Undetermined................ Applications must individually
consider the cumulative
impacts from past, present,
and reasonably foreseeable
actions known to occur at
specific sites for proposed
new nuclear reactors and
briefly present those
considerations in
supplemental NEPA
documentation. The staff
would address whether these
individualized evaluations of
potential cumulative impacts
alter any of the generic
analyses and conclusions
relied upon for Category 1
issues. The individualized
cumulative impact analyses
may also identify
opportunities where NRC might
rely upon the generic
analyses for some Category 1
issues for which certain of
the PPE or SPE values and
assumptions might be
exceeded.
Non-Resource Related Issues
Purpose and Need...................... 2 Undetermined................ Must be described in the
environmental report
associated with a given
application. Need for Power........................ 2 Undetermined................ Must be described in the
environmental report
associated with a given
application. Site Alternatives..................... 2 Undetermined................ Must be described in the
environmental report
associated with a given
application. Energy Alternatives................... 2 Undetermined................ Must be described in the
environmental report
associated with a given
application. System Design Alternatives............ 2 Undetermined................ Must be described in the
environmental report
associated with a given
application.
\1\ Data supporting this table are contained in NUREG-2249, “Generic Environmental Impact Statement for
Licensing of New Nuclear Reactors.” \2\ The categories are defined as follows: Category 1 issues--environmental issues for which the NRC has been able to make a generic finding of SMALL
adverse environmental impacts, or beneficial impacts, provided that the applicant's proposed reactor facility
and site meet or are bounded by relevant values and assumptions in the PPE and SPE that support the generic
finding for that Category issue. Category 2 issues--Environmental issues for which a generic finding regarding the environmental impacts cannot
be reached because the issue requires the consideration of project-specific information that can only be
evaluated once the proposed site is identified. The impact significance (i.e., SMALL, MODERATE, or LARGE) for
these issues will be determined in a project-specific evaluation. N/A--Issues related to exposure to electromagnetic fields (EMFs) for which there is no national scientific
agreement regarding adverse health effects. \3\ A finding of SMALL impacts means that environmental effects are not detectable or are so minor that they
will neither destabilize nor noticeably alter any important attribute of the resource. For the purposes of
assessing radiological impacts, the Commission has concluded that those impacts that do not exceed permissible
levels in the Commission's regulations are considered SMALL as the term is used in this table. For issues
where probability is a key consideration (i.e., accident consequences), probability was a factor in
determining significance. \4\ Because the Category 2 issues require a project-specific review, there are no associated values and
assumptions of the plant parameter envelope and site parameter envelope. A brief summary explanation for the
designation of the Category 2 issues is provided in lieu of values and assumptions.
For the Nuclear Regulatory Commission.
Dated: April 22, 2026. Carrie Safford, Secretary of the Commission. [FR Doc. 2026-08015 Filed 4-23-26; 8:45 am] BILLING CODE 7590-01-P
← B. Major Provisions to XVI. Availability of DocumentsContents
- The rule itself
Nuclear Regulatory Commission, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors,” 91 FR 22394 (April 24, 2026). Effective May 26, 2026.
https://www.federalregister.gov/documents/2026/04/24/2026-08015/generic-environmental-impact-statement-for-licensing-of-new-nuclear-reactors - This page
“Generic Environmental Impact Statement for Licensing of New Nuclear Reactors,” the text under “List of Subjects in 10 CFR Part 51.” Read the Mandate, https://readthemandate.org/rules/rule-2026-08015/text-2/ (retrieved August 27, 2026).
Cite the document when the claim is about what the document says. Cite this page when the indexing, the wording or the record of what has happened is what is being relied on.
How This Rule Is Set Out
Federal Register documents are United States government works and are not under copyright, so the rule is here whole rather than cut to an excerpt. It is split at the headings the Register itself prints: the line it is filed under, the captioned fields on its face, the preamble where the agency says what it is doing and why, and the amendments to the Code of Federal Regulations. No passage is shortened.
Two things the Register prints are not reproduced: the running head it repeats at every page break, and the tables it sets as pictures rather than as words. Its own marker for one of those tables, [GRAPHIC] [TIFF OMITTED], is left standing where the table was, so a reader can see that something is there and follow the link to the page it is on.
Every heading in the rule is listed on the rule's own page, which says which of these pages each one is on.